5.TRANSPORTATATION & INSTALLATION:
5-1.Unpacking
1. Transportation to desired location before unpacking, please use-lifting jack.
(Fig. B)
2. Transportation after unpacking, please use heavy duty fiber belt to lift up
the machine.
Fig. B
ALLWAYS KEEP PROPER FOOTING & BALANCE WHILE MOVING THIS
MACHINE.
5-2.TRANSPORTATION OF MACHINE:
As this machine weights 430kgs it is recommended that the machine be transported
with help of lifting jack.
Transportation Recommendation:
1.
Tighten
all locks before operation.
2.
Always
keep proper footing & balance
while moving this machine, and only
use a heavy duty of fiber belt to lift the
machine as per Fig. 1.
3.
TURN OFF
the power before wiring
& be sure machine is properly
grounded. Overload & circuit breaker
are recommended for safety wiring.
4.
Tighten
4 bolts to base holes after machine is
balanced.
Fig. 1
5.
Check
carefully if the saw blade is running in counter-
clockwise direction if not, reverse the wiring per circuit diagram,
then repeat the running test.
6.
Keep
machine always out from sun, dust, wet, or raining area.
7
Содержание 250S
Страница 1: ...METAL CUTTING BAND SAW MACHINE MODEL 250S INSTRUCTION MANUAL 250S 060505 R2...
Страница 24: ...12 CIRCUIT DIAGRAM 22...
Страница 25: ...OP 23...
Страница 26: ...24...
Страница 27: ...25...
Страница 28: ...26...
Страница 29: ...27...
Страница 30: ...28...
Страница 31: ...29...
Страница 32: ...30...