Hardware 

Installation Manual

Page 14

Installing the LCU

Each ROME Chassis is controlled by an LCU. The LCU install kit includes the LCU, a signaling cable (Y-Cable) 
to attach to the ROME Chassis, and a ground cable. 1 RU of space above the LCU is recommended to allow 
adequate space for connecting the LCU control and ground cable. 

Installing the LCU involves the following steps:

1.    Mounting the LCU 
2.    Connecting Cables (signalling and ground)
3.    Powering up ROME by plugging in both power cables

5.1 

Mounting the LCU

The LCU mounting kit comes with two L-brackets (ears) which are attached to the front of the LCU chassis and 
extension brackets in the back that is mounted on the rear post to support the LCU chassis. To install the LCU,  
slide the LCU into position, and secure the brackets to the rack.

The LCU should be installed on top of the ROME Chassis. 

5.2 

Connecting Cables (Signaling and Grounding)

5.2.1    Connecting the Signaling Y Cable

To connect the LCU to the ROME Chassis, the following steps should be taken:

 

1.    Connect the ROME signaling Y cable to the LCU output 

Backside of LCU with Signaling Y cable connected

Содержание Fiber Smart Networks ROME 128Q

Страница 1: ...DOC 0002 Hardware Installation Manual ...

Страница 2: ... respective owners The use of the word partner does not imply a partnership relationship between Wave2Wave and any other company The limited warranty for the accompanying product is set forth in the Wave2Wave ROME product warranty and is incorporated herein by this reference If you are unable to locate the limited warranty contact your Wave2Wave Solution representative for a copy Copyright 2019 Wa...

Страница 3: ...g ROME 9 3 1 Installation Preparation 9 3 2 Unpacking ROME 10 4 Installing the ROME Chassis 11 4 1 Mounting the ROME Chassis 11 4 2 Mounting the Patch Panel 12 4 3 Cabling Fiber and Ground 13 5 Installing the LCU 14 5 1 Mounting the LCU 14 5 2 Connecting Cables Signaling and Ground 14 5 3 Powering Up ROME 16 Appendices 17 1 ROME Dimensions 17 2 LCU Dimensions 18 3 Patch Panel Dimensions 19 4 Conso...

Страница 4: ...n To ensure safety all configurations of the rack cabinet must be certified by a nationally recognized testing laboratory in order to verify compliance with country specific safety regulations This process ensures that the end product remains safe for the operator and service personnel under normal and foreseeable misuse conditions Heavy Equipment Due to the heavy 165 lbs 75 kg weight of the ROME ...

Страница 5: ...be made first and disconnected last Avoiding Circuit Overload Overloading a circuit is potentially a fire hazard and a shock hazard under certain conditions To avoid these hazards 1 Take care when connecting units to the supply circuit so that wiring is not overloaded 2 Ensure that your system s electrical requirements do not exceed the branch circuit protections requirements Refer to ROME s elect...

Страница 6: ...udes the following 2 1 Parts List 2 ROME slider rail units for mounting ROME Chassis 1 Set of ROME Positioning Rulers 2 each for WECO and EIA racks 1 Clearance Level Tool Jig to ensure proper clearance and leveling of ROME chassis for proper installation Note Each slider rail unit is comprised of a rear bracket front bracket stiffener slider 6 socket head cap screws Each slider rail unit comes pre...

Страница 7: ...ssis 2 3 Installing Slider Rail Units Follow the steps below to install the ROME slider rail units on a four post rack Prior to continuing please make absolutely sure that the safety guidelines from section 1 3 2 Heavy Equipment have been followed correctly 1 Place the ROME positioning ruler on the rack rail The lower end of the ruler should be 12 inches from the rack floor It is recommended that ...

Страница 8: ...the rack Use the jig by placing it on the 2 extended slider arms a Check right to left leveling using a level adjust sliders front brackets as needed b Run the jig between the 2 sliders from the front of the rack to the back to check for clearance c When the jig is in the back check the level again Adjust back screws if needed 7 Installing additional set of sliders if applicable Install the ROME p...

Страница 9: ...aration Before beginning the installation of ROME equipment please make sure to Wear an ESD strap Have a mechanical lifting device available such as the one pictured which is required to lift and maneuver the heavy 87 kg 191 8lbs ROME equipment to avoid possible bodily injury ...

Страница 10: ...the outside of the package and make sure they re not activated red If either indicator is red stop the process and contact Wave2Wave 4 After the box is unpacked inspect the internal shock watch indicator and all elements of the unit for damage If either the indicator is activated or if there is any damage to the ROME equipment please do not proceed with installation and contact Wave2Wave ...

Страница 11: ...lar mount the first ROME unit on the lowest set of sliders Continue to mount ROME units from the bottom up Two people are recommended for this step of the process 1 Move the ROME Chassis to the lift 2 Position the ROME unit with the front panel on the the lift Provide enough room to mount sliders 3 Route the patch panel through the rack and leave it on the other side of the rack 4 Extend slide out...

Страница 12: ...ide the ROME Chassis into the rack 11 Secure the ROME to the front rack screwing the ears to the rack 4 2 Mounting the Patch Panel Sufficient cable length is provided to mount the patch panel in the front or rear of the four post rack Once the ROME Chassis has been fully installed in the rack the patch panel can be secured to the rack The patch panel is pre connected to ROME with a fiber cable and...

Страница 13: ...tend the ROME Chassis outwards for maintenance 4 3 2 Grounding the ROME Chassis Connect the customer facility ground to the ROME Chassis at the attachment point which is located at the lower left corner when looking at the back of the ROME refer to the pictures below Verify that the ground cables wires are made of copper and that the facility ground cable is at least 10 AWG Rear Ground Earth Point...

Страница 14: ...E by plugging in both power cables 5 1 Mounting the LCU The LCU mounting kit comes with two L brackets ears which are attached to the front of the LCU chassis and extension brackets in the back that is mounted on the rear post to support the LCU chassis To install the LCU slide the LCU into position and secure the brackets to the rack The LCU should be installed on top of the ROME Chassis 5 2 Conn...

Страница 15: ...onnector to the bottom signal box using the provided labels on the signaling Y cable If it is not connected correctly ROME will not operate The signaling cable from the LCU to the ROME Chassis should be secured to the rack Enough slack should be allow to fully extend the ROME Chassis out for maintenance 5 2 2 Grounding the LCU Connect the customer facility ground to the ROME LCU at the attachment ...

Страница 16: ...les 15P to C15 SJT 14AWG and plug in to turn on the ROME For other regions different power cables may be provided The LCU front panel has three LEDs These LEDs provide a quick visual indication of the system s functional status After power is connected to the both power supplies ROME will go through a booting and homing sequence and when successful only the green light will stay on The next step i...

Страница 17: ...E NAME UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN MILLIMETERS SURFACE FINISH TOLERANCES LINEAR ANGULAR Q A MFG APPV D CHK D DRAWNYONATAN ROME Side View Dimensional Details mm 30 32in 770mm 31 14in 791mm 0 2in 5mm 0 63in 16mm 5 4 6 7 8 A REVISION DO NOT SCALE DRAWING DEBUR AND BREAK SHARP EDGES UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN MILLIMETERS SURFACE FINISH TOLERANCES LINEAR ANGULAR WAVE ...

Страница 18: ...n 715 2mm 27 49in 698 2mm 17 48in 444 in 16 93in 430mm 17 44in 443mm 1 73in 44mm G 29 39in 745 5mm 16 93in 430mm 28 16in 715 2mm 27 49in 698 2mm 17 48in 444 in 16 93in 430mm 17 44in 443mm 1 73in 44mm G 29 39in 745 5mm 16 93in 430mm 28 16in 715 2mm 27 49in 698 2mm 17 48in 444 in 16 93in 430mm 17 44in 443mm 1 73in 44mm G 29 39in 745 5mm 16 93in 430mm Top View Rear View Side View Front View ...

Страница 19: ... 4 98in 126 6mm Appendix 3 Patch Panel Dimensions Appendix 4 Console Cable Pinout Signals and Pinouts for the Console RJ 45 to DB 9 Serial Cable Console Cable Pinout Console Port PC COM Port RJ 45 DB 9 Pins Signals Pins Signals 1 2 3 4 GND GND 5 TXD_RS232 3 RXD_RS232 6 RXD_RS232 2 TXD_RS232 7 8 ...

Страница 20: ...60 Hz 4A per PSU 48 60 Vdc 8A per PSU Power Consumption 55W Standby 150W 180W Peak While Switching Environmental Conditions Temperature Range operating 0 C to 40 C 32 F to 104 F Temperature Range storage 40 C to 70 C 40 F to 158 F Relative Humidity non condensing 5 to 95 Mechanical Specifications for Main Chassis Rack Unit 19 10RU Dimensions 17 4 442mm Width 17 5 443mm Height 31 791mm Depth Mounti...

Страница 21: ...d found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause ha...

Страница 22: ...1RU 1 71in U S Headquarters 47775 Fremont Blvd Fremont CA 94538 phone 1 408 586 8800 Contact Innovate Design Manufacture ...

Отзывы: