![wattsonic 4.0KW-3P Series Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/wattsonic/4-0kw-3p-series/4-0kw-3p-series_user-manual_3789393033.webp)
33
User Manual
4.0-20.0kW-3P Series
※
Step
1 Install the base
※
Step
2 Install the battery module and Sub-Master BMS
Check the installation environment to ensure ground level. Place the base on the
ground, and make sure it is level and stable.
After the base is installed, the remaining battery and Sub-Master BMS are then
placed in turn. Once each battery or Sub-Master BMS is in place, tighten it with four
m4 screws on the left and right side.
*1
*1
*1
*1
*1
*1
*1
*1
:
M4 screws
*1
:M4 screws
*1
Содержание 4.0KW-3P Series
Страница 1: ...Wattsonic 4 0 20 0KW 3P Series User Manual 4 5 6 8 10 12K 25A 3P 10 12 15 20K 25A 3P ...
Страница 2: ......
Страница 87: ...www wattsonic com ...