background image

ScaleNet

®

Commercial Water Treatment Systems

Top view with optional bypass 

ScaleNet

®

 Commercial Water Treatment Systems 

Installation – 1" Pipe 

The flow thru the Commercial Anti-Scale System is upward. Therefore, the inlet and outlet connections 
are opposite of traditional water treatment equipment. 
  
The flow rate must not exceed the maximum specified flow rate of the system. A flow control devise 
will be required for applications where flow rates may exceed the maximum specified flow rate. 
  

Part No. 

Tank Size  Pipe Size 

Max Service Flow 

M8407-COM 7x44 

1" 

10 

gpm 

M8408-COM 8x44 

1" 

12 

gpm 

M8409-COM 9x48 

1" 

16 

gpm 

M8410-COM 10x54 

1" 

20 

gpm 

M8412-COM 12x52 

1" 

30 

gpm 

 
Installation Instructions: 
1.

 

Place system on a smooth flat surface. 

2.

 

Install the fittings and / or the bypass (see separate instructions).  Slide the 
nut on first then the split ring and o-ring.  

3.

 

Connect incoming cold water to the inlet of the system. 

4.

 

Connect system outlet to service water of the house. 

5.

 

Partially open a valve down stream of the system to allow the air to purge 
from the system. 

6.

 

Slowly open inlet valve and allow the system to fill with water. 

7.

 

Close the down stream valve five minutes after all the air has been purged 
from the system and plumbing.  This flushes any fines out of the system. 

8.

 

Check for leaks and repair as required. 

9.

 

System is ready for use. 

 

Conditions for Operation:  

 

Minimum pressure 15 PSI 

 

Maximum pressure 125 PSI 

 

Minimum operating temperature 34 F 

 

Maximum operating temperature 120 F 

 

Water pH range 6.0 to 9.0 

 

Maximum feed water hardness is 75 grains per gallon. 

 

Hydrogen sulfide, iron, and manganese 

 

Pre-treatment required 

 

Maximum chlorine 3 ppm, de-chlorination recommended 

 

Oil and grease should not be present 

Warning - Do not exceed specified flow rates 

 

Inlet 

Note: Do not use where water is microbiologically unsafe or with water of unknown quality without adequate disinfection before or after the unit. 
System must be maintained according to manufacturer's instructions. Pre-treatment for sediment, Iron, Hydrogen Sulfide, Manganese, hydrocarbons 
and copper may be required depending on conditions. Install systems in new facilities with copper pipe after six weeks of water use. 

Outlet 

Отзывы: