V. MEMBRANE REPLACEMENT
1. Turn off the system and close the feed water shutoff valve.
2. Disconnect the tubing from the pressure vessel.
3. Remove the retaining "U" pins from the pressure vessels.
4. Push the old membrane out of the vessel in the direction of the feed flow
5. Record the serial numbers of the new membranes.
6. Lightly lubricate the brine seals on the new membranes with clean water.
7. Install the new membranes in the direction of flow with the brine seal end going in
last.
8. Lightly lubricate the end cap internal and external o-rings with glycerin.
9. Install the end caps and secure them with the "U" pins.
10. Reconnect the tubing to the pressure vessel.
11. Verify that all retaining "U" pins are installed.
12. Follow the start up procedure in section III-D.
Flow Direction
Membrane Brine Seal
Содержание R12-0150
Страница 1: ...REVERSE OSMOSIS INSTALLATION AND OPERATION MANUAL R12 Wall Mount...
Страница 2: ......
Страница 8: ...Figure 1...