5
Project Data Sheet
Job Details
Job Number: _____________________________________________
Model Number/Serial Number: ______________________________
Water Hardness: _______________ppm or gpg
Capacity Per Unit:
Mineral Tank Size: _____________Diameter: _____________ Height:
Salt Setting per Regeneration:
Regenerant Flow:_____________Upflow _____________ Downflow
1.
Meter Size:
A. 3/4" Paddle Wheel
B. 3/4" Turbine
C. 1" Paddle Wheel
D. 1" Turbine
E. 11/2" Electronic Inline Plastic Turbine
F. 11/2" Paddle Wheel
G. 2" or 3" Paddle Wheel: Stainless Steel ___________Brass ___________Plastic ___________
H. Generic ___________Pulse Count ___________Meter Size ___________
2.
System Type:
A. System #4: 1 Mineral Tank, 1 Meter, Immediate, or Delayed Regeneration
B. System #7: 2 Mineral Tanks, 1 Meter, Immediate Regeneration
C. System #14: 2-8 Mineral Tanks, 2-8 Meters, Immediate Regeneration,
Progressive Flow Tank Staging- GPM Threshold for Progressive
Feature _______________________________________________
D. ____________________________Other: System # Description
3.
Controller Program Settings:
A. Backwash: ___________________________________ Minutes
B. Brine and Slow Rinse: __________________________ Minutes
C. Rapid Rinse: __________________________________ Minutes
D. Brine Tank Refill: ______________________________ Minutes
E. Pause Time: __________________________________ Minutes
4.
Drain Line Flow Control:
__________________________ gpm
5.
Brine Line Flow Control:
___________________________ gpm
6.
Injector Size#:
________________________________________
7.
Water Pressure:
______________________________________
8.
Water Temperature:
___________________________________