background image

W

X

Z

U

Y

B1

B2

B3

Y

Y

Y

Y

X

V

3

MM-IM-FR-W-UK-06-18-Rev.0

0

5

10

15

20

25

30

0,5

0

1

1,5

2

2,5

3,5

3

Débit (L/min

)

Perte de charge (bar)

Flow curve

Flow rate

Head loss

∆P (bar)

L/min

Содержание MINIMIXing

Страница 1: ...MINIMIXing Thermostatic mixing valve for point of use Installation and Operation Manual wattswater eu ...

Страница 2: ...u tournant UK Swivel nut IT Dado girevole NL Vrouwelijke moer DE Überwurfmutter G 3 8 ISO228 ES Tuerca giratoria RU Накидная гайка PL Nakrętka obrotowa DK Drejemøtrik 5 6 7 93 8 71 7 31 G 1 2 B ISO228 G 1 2 B ISO228 G 1 2 B ISO228 Ø42 Ø42 Ø15 FR Raccord compression UK Compression fitting IT Collegamento a compressione NL Knelkoppeling DE Klemmkupplung ES Conexión de compresión RU Компрессионный фи...

Страница 3: ...W X Z U Y B1 B2 B3 Y Y Y Y X V 3 MM IM FR W UK 06 18 Rev 0 0 5 10 15 20 25 30 0 5 0 1 1 5 2 2 5 3 5 3 Débit L min Perte de charge bar Flow curve Flow rate Head loss P bar L min ...

Страница 4: ...and re tighten the nut X Supply hot and cold water rinse the piping by letting the water flow abundantly Turn off the hot and cold water then unscrew the nut X and remove the rinsing kit V refit the cartridge Z and re tighten the nut X 1 3 Adjusting the temperature factory set to 38 C diagram B2 page 3 Turn on the water supply to the appliance Calibrate the temperature Run the water at the require...

Страница 5: ... When the appliance is exposed to frost it is essential to empty it and remove the element taking off the element Once the ins tallation is emptied put the element back place after lubricating it with a silicon grease 4 2 Replacing the mechanism Close the hot and cold water inlet stopcocks then turn the taps on and off to lower the pressure inside the appliance Proceed as indicated in the INSTALLA...

Отзывы: