Watts LF1170 Series Скачать руководство пользователя страница 2

Figure 2

Radiant Heat Application

from Boiler

Cold 

 

Radiant Return

Mixed 

 

to Radiant

to Boiler

Watts Flow 

Check

Watts 

Ball Valve

TP  

Test Plug

Watts 

Ball Valve

RPV

CV, CVS 

Check Valve

Circulator

LF1170-M2, 

LFL1170-M2

Hotter

3

/

32

" Hex Wrench

Turn

Colder

Unscrew, lift 

cap to adjust

Figure 3
Temperature Adjustment

 Factory Preset:

 

LF1170-M2: 120°F (49°C) 

 

LFL1170-M2: 90°F (31°C)

 Under following conditions:

 

Cold Inlet: 60-70°F (16-21°C) 

 

Hot Inlet: 140-145°F (60-63°C) 

 

Supply Pressure: 45psi (3.15 bar)

1.  Let water flow for at least two minutes to allow supply tem-

perature to stabilize.

2.  Calibrate the mixed water outlet temperature by placing a 

thermometer in the mixed water stream.  

3.  To adjust the setting of the valve, loosen locking cap screw 

with hex wrench, see Figure 3. Cap must be lifted 1/4" to 

adjust temperature. To increase the temperature, turn coun-

terclockwise. To decrease temperature turn clockwise.

4.  Lower handle and tighten screw.
5. Check outlet temperature.

Quick-Connect Installation

1.  Mark pipe as shown.  

This is pipe insertion depth.

2. Clean pipe end.

1. Remove collet clip.

2. Depress collet.

3. Pull tubing from tailpiece.

3.  If using PEX tubing, insert pipe 

stiffener (provided) into end of pipe.

4.  Push tubing into tailpiece up to mark.

5. Insert collet clip.

  To Connect

  To Disconnect

PEX tubing only

Pipe Stiffener

Tail Piece

Mark

Collet clip

Collet depressed

1

1

/

2

 in. (38.1mm)

1

3

/

4

 in. (44.45mm)

1

7

/

8

 in. (47.63mm)

3

/

4

 in.Pipe (19.05mm)

1 in.Pipe (25.4mm)

1

/

2

 in.Pipe (12.7mm)

Figure 1
Domestic Hot Water Application

Watts  

Vacuum Relief 

Valve

Watts  Temperature

 

Gauge

Cold

Cold

Cold

LF1170-M2 or  

LFL1170-M2

Tempered 

Hot

Hot to 

 

Appliances

Watts T&P  

Relief Valve

*8" – 12"

H
C

M

Domestic Hot Water Application 

NOTICE

To prolong the life of the valve, it is recommended the valve  

be trapped as shown

  Devices tested to ASSE 1016, ASSE 1070 or ASSE 1069  

such as Watts LFUSG, LFL111 or LFMMV should be used  

at fixture to prevent possible injury.

Содержание LF1170 Series

Страница 1: ...amage or damage to the equipment Keep this Manual for future reference WARNING Use caution when soldering Protect yourself and others FUMES AND GASES can be hazardous to your health HEAT RAYS INFRARED RADIATION from flame or hot metal can injure eyes WARNING You are required to consult the local building and plumbing codes prior to installation If the information in this manual is not consistent w...

Страница 2: ...To decrease temperature turn clockwise 4 Lower handle and tighten screw 5 Check outlet temperature Quick Connect Installation 1 Mark pipe as shown This is pipe insertion depth 2 Clean pipe end 1 Remove collet clip 2 Depress collet 3 Pull tubing from tailpiece 3 If using PEX tubing insert pipe stiffener provided into end of pipe 4 Push tubing into tailpiece up to mark 5 Insert collet clip To Connec...

Страница 3: ... outlet 10 F 5 6 C minimum required 2 Reinstall valve with supplies connected to marked inlets 3 Clean filters Unable to achieve required flow 1 Too much pressure drop at fixture 2 Checks valve filters blocked by debris 1 Measure supply pressures and check against flow chart Look for restrictions in valve or piping 2 Clean check valves filters Valve does not maintain required temper ature or tempe...

Страница 4: ...h is damaged if this product does not work properly other costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no control This warranty shall be invalidated by any abuse misuse misapplication improper installation or improper maintenance or alteration of ...

Отзывы: