HS-200 PT
Installation Instructions
Refer to drawing A2 in this brochure for mounting instructions, minimum service clearances and
service connections.
Utility Requirements:
Note: A floor drain within 10 feet of the Boiler Mate is required.
½” potable cold water supply – 2gpm, 45-110 degrees F, 50 – 90 psig
-
2000TDS, 250ppm or 14 grains hardness
Operation
Once all service and output connections are made, simply turn on cold water supply to the unit.
Maintenance
Quarterly - Replace pre-filters – items # 1, 2, 3, & 8.
Annually - Replace membrane cartridges – item# 4.
Replacement Parts
PM Package –Part# 501020
PM package includes a 1 year supply of Items #1, 2, 3, 4 & 8
Individual part numbers for component parts – refer to drawing A1 in this brochure.
(Front view with access panel removed)