Setting the Altitude Pilot

STEP 6

Slowly open the downstream isolation valve.

STEP 7

If the valve remains closed as indicated by the stem position in 
the position indicator (See Figure 2) and the tank level is known 
to be below the desired level, SLOWLY turn the adjustment screw 
IN, clockwise, by ¼ to ½ turn increments (See Figure 3).

This will cause the valve to start opening, filling the tank. 
Additional clockwise adjustment may be necessary to raise the 
level to the overflow line.

 

20

 

Setting the Altitude Controls

STEP 1

Pre-set pilots as noted:

Altitude Control

 – Adjust OUT, counterclockwise, backing pressure off the spring. This simulates a low tank setting which can be 

gradually increased to the desired setting.

Opening and Closing Speed

 – Turn the adjustment screws on the Closing Speed and Opening Speed Controls, if the main valve is so 

equipped, OUT, counterclockwise, 1½ to 2½ turns from full closed position.

STEP 2

Energize the solenoid to check actuation and to confirm connection 
to power source and so that initial valve filling is against the closed 
solenoid.

NOTE:

 In cases when testing is required prior to electrical installa-

tion the solenoid can be manually engaged using the manual over-
ride red knob on the end of the solenoid.

STEP 3

To ensure proper operation, any trapped air will need to be bled off 
the valve cover during startup. The ACV includes a bleed valve, use 
a flat head screwdriver to slowly open the valve (See Figure 1).

STEP 4

Pressure the line, by opening the upstream isolation valve slowly. Air 
is vented through the air bleed valve. Tighten the fitting when liquid 
begins to vent (See Figure 1).

Repeat the process until no air is trapped in the system.

STEP 5

Switch the solenoid to the open position (de-energize solenoid).

Counterclockwise to OPEN 

bleed valve

Figure 1 

Position Indicator

Clockwise to INCREASE 

minimum tank level set 

point.

Figure 3 

Model 27 - Altitude Pilot

Figure 2 

Position Indicator Stem in UP Position 

Indicating Valve OPEN

© 2021 Watts

Installation, Operation and Maintenance - Series LF960GD-15 

Содержание AMES LF960GD-15 Series

Страница 1: ...ensed contractor in accordance with local codes and ordinances WARNING Need for Periodic Inspection Maintenance This product must be tested periodically in compliance with local codes but at least onc...

Страница 2: ...opening and closing speeds are separately adjustable The Position Indicator with Air Bleed Petcock allow for visual indication of valve position and allows easy venting of air entrapped in the main v...

Страница 3: ...ies LF960GD 15 This Ames Automatic Control Valve ACV is a full port single chamber basic valve that incorporates a one piece disc and dia phragm assembly This assembly is the only moving part within t...

Страница 4: ...530 1945 Pressure Drop psi 2 3 4 6 8 10 20 30 40 60 80 100 Flow Rate Gallons per minute Water 2 4 10 20 40 60 80 100 200 500 1000 2000 5000 10000 20000 100000 8 6 4 8 1 0 1 2 1 4 1 6 6 2 1 1 2 3 8 1 0...

Страница 5: ...l 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron...

Страница 6: ...e NPT Port Size NPT Shipping Weights A B C D E F G H I J K L in in mm in mm in mm in mm in mm in mm in mm in mm in mm in mm in in lbs kgs 11 4 71 4 184 51 2 140 3 8 1 4 20 9 11 2 71 4 184 81 2 216 51...

Страница 7: ...As water level increases the sensed tank head pressure increas es above the control setpoint of the Model 27 causing it to de pressurize the cover of the 3 Way Accelerator closing the Main Valve Turn...

Страница 8: ...11 Upper Jam Nut 12 Lower Jam Nut 13 Upper Diaphragm Washer 14 Diaphragm 15 Lower Diaphragm Washer 16 Shaft 17 Bearing 18 O Ring 19 Machine Screw 20 F23 Body 21 Stem 22 Spring 23 O Ring 24 F23 Seat 25...

Страница 9: ...Float or Altitude Pilot to operate the Main Valve open and closed When the cover of the Accelerator Pilot is de pressurized the main valve cover chamber is connected to upstream pressure causing the...

Страница 10: ...lve cover This causes the main valve to close until inlet pressure is again greater than outlet Model LFCK Standard Material Brass Housing and Body Stainless Steel Indicating Rod Optional Material Sta...

Страница 11: ...he free flow direction the seat moves out of the flow path to all unrestricted flow Specifications Model LFFC FLOW CLOSED Fluid Speed Controlled by Needle FLOW OPEN Free Flow Seat Full Open FLOW CLOSE...

Страница 12: ...Free Diverter Ball Valves Sizes 1 4 2 Series LFB6780 M1 2 Piece Full Port Lead Free Copper Silicon Alloy Diverter Ball Valves are designed to divert liquids and gases in commercial and industrial app...

Страница 13: ...Brass standard Stainless Steel optional Elastomers Nitrile standard EPDM optional Viton optional Voltage 24VDC 24VAC or 120VAC Enclosure General Purpose NEMA 4 standard Explosion Proof NEMA 6 6P 7 9 o...

Страница 14: ...des The screw driver operated test cock installed on the top of the Model 50 housing provides a controlled method of removal of air from the cover chamber during start up or troubleshooting of the Mai...

Страница 15: ...re used in pilot lines to provide a positive shutoff in any override or maintenance situation for simple trouble shooting This 2 piece full port valve features bottom loaded stems PTFE seats and packi...

Страница 16: ...r Size 1 4 3 4 NPT Model LF60 Flo Clean Strainers are used to filter the fluid pass ing through the pilot circuit and provide protection to pilot circuit speed controls and pilots It is installed in t...

Страница 17: ...ot circuit speed controls and pilots The filter element can be accessed for cleaning by removing the clean out cap or may be cleaned by installing an optional blow down ball valve The wetted surface o...

Страница 18: ...tact the trip arm when the main valve is closed The collar can be positioned on the stem by loosening the set screw to actuate the switch at the desired point of valve travel Single Pole Double Throw...

Страница 19: ...ion with the cover facing up main valve stem vertical Slow operation or premature stem and guide wear may occur if valve is not installed according to factory recommendations Consult factory for detai...

Страница 20: ...on STEP 2 Energize the solenoid to check actuation and to confirm connection to power source and so that initial valve filling is against the closed solenoid NOTE In cases when testing is required pri...

Страница 21: ...dependent upon the installation application and may not be required on all valves When the valve is closed the Altitude control screw adjustment may be turned OUT counter clockwise an additional to tu...

Страница 22: ...valve specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace di...

Страница 23: ...ation valves ensure open Diaphragm is damaged Conduct diaphragm seal test repair and replace if necessary Main valve stem assembly corroded damaged Inspect stem assembly clean replace if necessary Blo...

Страница 24: ...require a lifting eye bolt to be installed in the valve stem accessory threads located on the very top of the valve stem 5 Before removing Stem Nut examine stem threads for mineral build up Remove dep...

Страница 25: ...ern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrity of the Seat Seal by...

Страница 26: ...er costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has...

Отзывы: