background image

3

IOM-A-Deringer 20/30_2.5-4

 

   2005 

EDP#2916002

 

© 2020 Watts

Closing Shutoff Valves Prior to Maintenance

1.   Slowly rotate shutoff valve #2 handle clockwise to the closed 

position. Flag perpendicular to flow (A).

2   Slowly rotate shutoff valve #1 handle clockwise to the closed 

position. Flag perpendicular to flow (A).

NOTICE

When yellow/orange position indicator flags are parallel with the flow of water 
the shutoff valves are in the open position. Before doing any maintenance be 
sure the yellow or orange flow indicators (flags) are perpendicular to the flow 
of water valve body indicating shutoff valves are in the closed position (A). 

FLOW

FLOW

Opening Test Cocks and Bleeding All Pressure  

from the Line Before Maintenance

NOTE: valve is still under pressure. When opening test cocks, 

water will be released. Take precautions to ensure discharging 

water does not damage the surrounding area/equipment or  

create an unsafe condition.

1. 

 DO NOT OPEN

 Main test cock number 1, as it is still  

subject to line pressure.

2.   Using the Deringer

TM

 test cock wrench or a small adjustable 

wrench open (A) main test cock number 4.  

(Test cock is open when wrench flats are parallel to water 

flow through test cock)

3.   Deringer 30 only: Using a #2 flathead screwdriver open 

bypass test cock number 2. (Test cock is open when screw-

driver slot is parallel to water flow through test cock (B))

4.   Using the Deringer test cock wrench or a small adjustable 

wrench open main test cock number 3.

5.   Deringer 30 only: Using a #2 flathead  

screwdriver open bypass test cock  

number 1. 

6.   Using the Deringer test cock  

wrench or a small adjustable  

wrench open main test  

cock number 2.

FLOW

B

B

A

A

A

Closed

Open

Bypass Test Cock

Main Test Cock

Closed

Open

Closed

Open

Содержание AMES Deringer 20

Страница 1: ...ety and use information can result in death serious personal injury property damage or damage to the equipment Keep this manual for future reference You are required to consult the local building and plumbing codes prior to installation If the information in this manual is not consistent with local building or plumbing codes the local codes should be followed Inquire with governing authorities for...

Страница 2: ...n Other versions of the same tool can be used For example allen wrenches instead of allen drive sockets Tools Required T45 Torx Wrench Wood Block 2 x 4 x 5 Wood Block 1 x 2 x 16 2 Phillips Head Screwdriver 2 Flathead Screwdriver 5 8 Ratchet Wrench Adjustable Wrench Deringer Test Cock Wrench Slip Joint Pliers ...

Страница 3: ... opening test cocks water will be released Take precautions to ensure discharging water does not damage the surrounding area equipment or create an unsafe condition 1 DO NOT OPEN Main test cock number 1 as it is still subject to line pressure 2 Using the DeringerTM test cock wrench or a small adjustable wrench open A main test cock number 4 Test cock is open when wrench flats are parallel to water...

Страница 4: ...nner wall of the valve body B 2 Insert a flathead screwdriver between the inner valve body and the first check module flange C gently push the first check module in the downstream direction until the first check module can easily be removed from the access port by hand B Removing the Second Dual action Check Module FLOW C A 1 Remove 1st check prior to removing 2nd check as described above 2 Use a ...

Страница 5: ...seat Do not remove unless the seat cage is being replaced 6 Reverse the order of above instructions to reassemble bypass check Valve A Part 2 1 To replace a damaged red silicone poppet disk use a 2 phillips head screwdriver to remove the disk retaining screw A 2 Remove disk retaining washer B 3 Use a flathead screwdriver to remove the gasket from poppet cavity C 4 Install new red silicone poppet d...

Страница 6: ...o reinstall bypass meter Remember to install gaskets F before threading meter coupling nuts into place B C E E G F E FLOW D A Maintenance of First Dual action Check Module 1 Use a 2 phillips head screwdriver to remove tower screws A from the first check seat B the double torsion spring is captured C and does not to be retained during maintenance 2 After removing the tower screws A examine the elas...

Страница 7: ... A examine the elastomer disk D and check seat E for fouling or damage 3 Should elastomer disk D need replacement unscrew disk retainer screws F and remove disk retainer G Carefully remove and replace elastomer disk D When replacing elastomer disk D be certain that no air water or debris is trapped in the clapper H cavity behind the elastomer disk D 4 Reverse the order of the above instructions to...

Страница 8: ...h F against the backside of the second check seat ring G Using a 1 x4 piece of wood cut to 16 length H as a lever between access port wall the 2 x4 F gently move the second check module A into its fully seated position 3 Be certain second check module A is fully seated and check O ring E is NOT fish mouthed or damaged 4 Tighten the second check retaining screws I ONLY AFTER the first check module ...

Страница 9: ...ed 4 Now fully tighten the first and second check retaining screws I The first check module must be fully seated to ensure retainer screws do not bind against check towers Binding retainer screws against check towers will result in permanent damage to first check modules WARNING FLOW Not Binding Binding C A B E F G D NOTICE Recommended torque for the check retainer bolts is 50 ft lb I Installing A...

Страница 10: ...driver close bypass test cock number 1 and 2 B Test cock is closed when screwdriver slot on stem is perpendicular to water flow through test cock 3 Use the T handles to open bypass ball valve number 1 D and then open bypass ball valve number 2 C Ball valve is open when T handle is parallel to water flow through ball valve 4 Double check to be certain of the following All cover bolts are tightened ...

Страница 11: ...line water flow 2 As the valve fills with water air will be pushed through the test cocks Once a steady flow of water is released from the test cocks close in order 2 3 then 4 Test cock is closed when wrench flats on stem are perpendicular to water flow through test cock 3 Slowly rotate the number 2 Shutoff valve operation Handle B counter clockwise to the open position FLOW C C B NOTICE Yellow or...

Страница 12: ...ty shall constitute the sole and exclusive remedy for breach of warranty and the Company shall not be responsible for any incidental special or consequential damages including without limitation lost profits or the cost of repairing or replacing other property which is damaged if this product does not work properly other costs resulting from labor charges delays vandalism negligence fouling caused...

Отзывы: