Setting the Solenoid Control Valve

STEP 1

Pre-set pilots as noted:

Opening and Closing Speed

 - Turn the adjustment screws on the Closing Speed and Opening Speed Controls, if the main valve is so 

equipped, OUT, counterclockwise, 1½ to 2½  turns from full closed position.

STEP 2

Energize the solenoid to check actuation and to confirm connection to power source and so that initial valve filling is against the closed 
main valve.

STEP 3

De-energize the solenoid so that initial valve filling is against the 
closed main valve.

STEP 4 

To ensure proper operation, any trapped air will need to be bled 
off the valve cover during startup. If your ACV includes a bleed 
valve, use a flat head screwdriver to slowly open the valve (See 
Figure 1).

If your valve does not include a bleed valve, bleed air by loosen-
ing a fitting on the valve or a plug, at the highest point of the valve 
assembly.

STEP 5

Pressure the line, by opening the upstream isolation valve slowly 
Air is vented through the air bleed valve or loosened fitting. 
Tighten the fitting when liquid begins to vent (See Figure 1). 

Repeat the process until no air is trapped in the system.

Globe

Angle

Size (in)

1

 

1/4

1

 

1/2

2

21/2

3

4

6

8

10

12

14

16

20

24

A (in)

16

16

20

22

22

24

32

34

38

44

48

52

56

56

B (in)

10

10

12

14

14

16

24

26

28

30

34

40

48

48

Size (in)

1

 

1/4

1

 

1/2

2

2

 

1/2

3

4

6

8

10

12

14

16

C (in)

16

16

20

22

22

24

32

34

38

44

48

52

D (in)

10

10

12

14

14

16

24

26

28

30

34

40

Counterclockwise to OPEN 

bleed valve

The following tables detail the recommended minimum valve servicing dimensions.

          

B

          

          

FLOW

FLOW

FLOW

          

FLOW

Valve Servicing Dimensions

Figure 1 

Position Indicator

IOM-A-ACV-930-01-19_630-01-19   2115 

EDP# 1917086 

© 2021 Watts         3

Содержание AMES 930GD-01-19

Страница 1: ...g the Solenoid Control Valve 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions to the info...

Страница 2: ...ing up main valve stem vertical Slow operation or premature stem and guide wear may occur if valve is not installed according to factory recommendations Consult factory for detailed engineering review...

Страница 3: ...lve does not include a bleed valve bleed air by loosen ing a fitting on the valve or a plug at the highest point of the valve assembly STEP 5 Pressure the line by opening the upstream isolation valve...

Страница 4: ...ain valve checking that the main valve opens Step 8 Actuate either electrically or manually the solenoid to closed position to check that the main valve closes STEP 9 Closing Speed Needle Valve Adjust...

Страница 5: ...cification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm or...

Страница 6: ...valves ensure open Diaphragm is damaged Conduct diaphragm seal test repair and replace if necessary Main valve stem assembly corroded damaged Inspect stem assembly clean replace if necessary Blockage...

Страница 7: ...e cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require the...

Страница 8: ...h or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are threaded...

Страница 9: ...in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrity...

Страница 10: ...less Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 13 Seat Disc Buna N Nitrile 14 Spa...

Страница 11: ...IOM A ACV 930 01 19_630 01 19 2115 EDP 1917086 2021 Watts 11 NOTES...

Страница 12: ...sulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no control...

Отзывы: