background image

10          IOM-A-ACV-950-15_650-15   2115 

EDP# 1917072 

© 2021 Watts

IOM-A-ACV-950-15_650-15   2115 

EDP# 1917072 

© 2021 Watts         11

Optional 

Xylan 

Coating

17A

6

1

2

3

4

5

7

8

9

11

12

13

14

15

16

17

18

10

Item

Description

Material

1

Pipe Plug

Lead Free Brass

2

Cover 

ASTM A536 65-45-12 Epoxy Coated Ductile Iron

3

Cover Bearing

ASTM A276 304 Stainless Steel

4

Stud with Cover Nut and Washer

ASTM A570 Gr.33 Zinc Plated Steel

5

Body

ASTM A536 65-45-12 Epoxy Coated Ductile Iron

6

Spring

ASTM A276 302 Stainless Steel

7

Stem Nut

ASTM A276 304 Stainless Steel

8

Lock Washer

ASTM A276 304 Stainless Steel

9

Stem Washer

ASTM A276 304 Stainless Steel

10

Diaphragm Washer

ASTM A536 65-45-12 Epoxy Coated Ductile Iron

11

Diaphragm*

Buna-N (Nitrile)

12

Disc Retainer

ASTM A536 65-45-12 Epoxy Coated Ductile Iron

13

Seat Disc* 

Buna-N (Nitrile)

14

Spacer Washer*  x5

NY300 Fiber*

15

Disc Guide

ASTM A743 CF8M (316) Stainless Steel

16

Shaft 

ASTM A276 304 Stainless Steel

17

Seat Ring**

ASTM A743 CF8M (316) Stainless Steel

17A

Seat Screw** (8" and Larger) 

ASTM A276 304 Stainless Steel

18

Seat Gasket*

Buna-N (Nitrile)

* Contained in Main Valve Repair Kit

**Note: 6 inch and Smaller Valves, Seat Ring is threaded

Installation: If unit is installed in any orientation other than 

horizontal (cover up) OR extreme space constraints exist, 

consult customer service prior to or at the time of order. 

NOTICE

ACV Assembly Diagram – Series 950GD-15

Содержание AMES 650GD-15

Страница 1: ...e Rate of Flow Controls 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions to the informati...

Страница 2: ...ator can be installed to provide visual indication of valve position and operation without disassembly 3 Install isolation valves upstream and downstream of the main valve 4 Provide adequate clearance...

Страница 3: ...the valve See Figure 1 STEP 4 Pressure the line by opening the upstream isolation valve slowly Air is vented through the air bleed valve Tighten the fitting when liquid begins to vent See Figure 1 Re...

Страница 4: ...trol allows free flow into the cover and restricted flow out of the cover of the main valve If valve opening is too slow turn the adjustment screw OUT counterclockwise increasing the rate of opening S...

Страница 5: ...specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm...

Страница 6: ...isolation valves ensure open Diaphragm is damaged Conduct diaphragm seal test repair and replace if necessary Main valve stem assembly corroded damaged Inspect stem assembly clean replace if necessary...

Страница 7: ...move cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require...

Страница 8: ...rush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thread...

Страница 9: ...uts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integri...

Страница 10: ...ess Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 13 Seat Disc Buna N Nitrile 14 Spac...

Страница 11: ...IOM A ACV 950 15_650 15 2115 EDP 1917072 2021 Watts 11 NOTES...

Страница 12: ...resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no cont...

Отзывы: