Benchmark Platinum-Edge [ii]: Installation Manual
SECTION 2
– INSTALLATION
OMM-
136_H • GF-210 • 1/6/2021 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
46
of
62
2.16 Next Steps
Once the unit is physically installed per the instructions above, the next steps are:
•
Optionally, implement the onAER option, which allows your unit to be monitored
remotely. To implement this option, complete the instructions in the next section,
onAER
Setup
.
•
Start the unit for the first time and perform the combustion calibration procedure. For
instructions, see the
Benchmark-Edge [i] Operation and Service Manual
, OMM-0137
(GF-210), Section 4:
Initial Startup
.