Benchmark Platinum-Edge [ii]: Installation Manual
SECTION 2
– INSTALLATION
OMM-
136_H • GF-210 • 1/6/2021 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
36
of
62
Figure 2-10b: BMK2500
– 6000 Power Panel Internal Components
NOTES:
•
The 115V to 24V transformer provides power for the Edge Controller and the Sequencing
Isolation Valve. It is mounted on the back side of the Main Power Panel. All other
components in the Power Panel are mounted on a DIN rail on the front side of the panel.
•
All electrical conduit and hardware must be installed so that it does not interfere with the
removal of any unit covers, inhibit service/maintenance, or prevent access between the
unit and walls or another unit.
2.11 FIELD CONTROL WIRING
–
I/O Board
Each unit is fully wired from the factory with an internal operating control system. No field control
wiring is required for normal operation. However, the Edge Controller used with your Benchmark
unit does allow for some additional control and monitoring features. Wiring connections for
these features are made on the Input/Output (I/O) board located behind the
unit’s removable
front panel, as shown in Figure 2-11.
Figure 2-11: Power Panel and Input/Output (I/O) Board Location
WIRE CONDUITS
POWER
BREAKER
12V POWER SUPPLY
TERMINAL BLOCKS
I/O BOARD
(with protector)
FUSE BLOCK
FUSE BLOCK
MAIN POWER
PANEL
(cover removed)
SECONDARY
POWER PANEL
(cover removed)