Benchmark with Edge [I] Controller: Reference Manual
SECTION 6: BENCHMARK 5000 & 6000 PART LIST
OMM-
0146_A • GF-219 • 5/25/2020 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
68
of
76
Benchmark 5000-6000 Valve Proving System
P/N 24655 rev C
–
8/23/2018
Item Qty Part #
Description
Item Qty Part #
Description
1
1
24629-5
Valve Proving System Assy.
6
1
97087-48
Flexible Gas Tube (NOT SHOWN)
2
1
33261
Bracket, VPS Support
7
1
97087-26
Flexible Gas Tube (NOT SHOWN)
The Benchmark gas train P/N
22330-2
operates in conjunction with a Valve Proving System,
P/N
24655
. This system monitors the gas pressure on both sides of the Actuator. If the pressure
difference falls below a fixed value, indicating the failure of the Actuator or leakage in the gas
line, it triggers the shutdown of the boiler.
Once the problem has been diagnosed and corrected, the Valve Proving System must be reset
by pressing the red
Reset
switch before the unit is restarted.
RED ALARM LIGHT &
RESET SWITCH
1.
OFF
during normal
operation
2.
ON
indicates a leak
or Actuator failure
YELLOW RUN LIGHT
1.
OFF
during normal operation
2.
ON
during valve proving operation
3.
ON
when unit is not running
2
1