  A. All needle valves must be closed on test kit.
  B.  Open test cock No. 4 and flush test cocks Nos. 1, 2 and 3 on reduced pressure  

 

assembly then close test cock No. 4.

  C. Attach hoses as shown. Bleed air from kit, close No. 2 shutoff.

909QT/LF909QT shown

No. 2 shutoff

Bleed Valve A

Bleed Valve B

High 

(red)

Bypass 

(yellow)

Low 

(blue)

Test No. 1 - Check Valve No.2

Purpose:

 To test check valve No. 2 for tightness against  

reverse flow.

Requirements:

 Valve must be tight against reverse flow under all 

pressure differentials.

Step 1

  Slowly open the needle valve “A” high side (red) and “C”  

 

bypass (yellow). Keep the “B” low (blue) closed.

Step 2

  Open test cock No. 4.

Step 3

  Indicated pressure differential will decrease slightly. If 

 

pressure differential continues to decrease (until the vent  

 

opens) the No. 2 check valve is reported as “leaking”.

Test  No. 2 - Shutoff Valve No. 2

Purpose:

 To test shutoff valve No. 2 for tightness.

Step 1

  After passing Test No. 1, continue to test No. 2 by  

 

closing test cock No. 2.

Step 2

  The indicated pressure differential will decrease slightly.  

 

If pressure differential continues to decrease 

 

(approaching “zero”), the No. 2 shutoff valve is reported  

 

to be “leaking”. 

 

NOTICE

A leaking No. 2 shutoff will give a  

 

false reading in tests No. 3 and 4.

Test No. 3 - To Test No. 1 Check Valve

Purpose:

 To test check valve No. 1 for tightness.

Requirements:

 Valve must be tight against reverse flow under all 

pressure differentials.

Step 1

  Close needle valve “A” high side (red) and open test  

 

cock No. 2

Step 2

  Close test cock No. 4. Disconnect bypass hose (yellow)  

 

at test cock No. 4.

Step 3

  Open needle valve “B” low (blue) and “C” bypass  

 

(yellow), bleeding to atmosphere, then closing needle 

 

valve “B” (blue) restores the system to a normal  

 

static condition.

Step 4

  Observe the pressure differential gauge. If there is a 

 

decrease in the indicated value, the No. 1 check valve is  

 

reported as “leaking”.

Test No. 4 - Pressure Differential Relief Valve

Purpose:

 To test operation of pressure differential  

relief valve.

Requirements:

 The pressure differential relief valve must operate 

to maintain the “zone” between the two check valves at least 2psi 

less than the supply pressure.

Step 1

  Close needle valve “C” bypass (yellow).

Step 2

  Open needle valve “A” high side (red).

Step 3

  Open needle valve “B” low (blue) very slowly until the 

 

differential gauge needle starts to drop.

Step 4

  Hold the valve at this position and observe the gauge  

 

reading at the moment the first discharge is noted from  

 

the relief valve. Record this as the opening differential  

 

pressure of the relief valve.

 

NOTICE

It is important that the differential gauge needle drops slowly.

Step 5

  Close test cocks Nos. 2 and 3. Remove hose from test  

 

cocks Nos. 2 and 3.

Step 6

  Use bypass hose (yellow) to relieve pressure from test  

 

kit by opening needle valve “A”, “B” and “C” and bleed  

 

valves “A” and “B”.

Step 7

   Remove all test equipment and open No. 2 shutoff 

valve of the device.

4

CAUTION

!

To prevent freezing, hold Test Kit vertically to drain differential 

gauge and hoses prior to placing in case. 
For additional testing information, refer to IS-TK-DP/DL,  

IS-TK-9A, IS-TK-99E or IS-TK-99D.

Test Procedure for Reduced Pressure Assembly

Содержание 909 Series

Страница 1: ...nsistent with local building or plumbing codes the local codes should be followed Need for Periodic Inspection Maintenance This product must be tested periodically in compliance with local codes but a...

Страница 2: ...the relief valve is positioned below the first check This unique feature allows the valve to be installed either vertically or horizontally 7 Installation procedures must comply with all state and lo...

Страница 3: ...ne and in an accessible location to facilitate testing and servicing A discharge line should be piped from the air gap at the relief valve connection making sure there is adequate drainage Never pipe...

Страница 4: ...cock No 2 Step 2 Close test cock No 4 Disconnect bypass hose yellow at test cock No 4 Step 3 Open needle valve B low blue and C bypass yellow bleeding to atmosphere then closing needle valve B blue re...

Страница 5: ...ing the first check valve cover 2 Lift off the first check valve cover The check valve inside will come out with the cover and is attached with a bayonet type locking arrangement 3 Holding the check v...

Страница 6: ...misalignment Figure 1 Figure 2 Figure 3 Figure 1 To assemble the Relief Valve Assembly have a screwdriver ready Figure 2 Depress the Relief Valve Assembly carefully guiding it against the two pound s...

Страница 7: ...trically ground the piping system and or electri cally isolate the device with plastic pipe immediately upstream and down stream of the device B 6 Valve improperly reassembled B 6 If valve is dis as s...

Страница 8: ...r the cost of repairing or replacing other property which is damaged if this product does not work properly other costs resulting from labor charges delays vandalism negligence fouling caused by forei...

Отзывы: