background image

Manual #199355  

Rev 08/14/15 

© 2015 Watts Premier

8716 West Ludlow Dr, Ste 1, Peoria, AZ 85381 • Tel. (800) 752-5582 • www.wattspremier.com

A Watts Water Technologies Company

THIRD FILTER BOWL

ON FIVE-STAGE ONLY

TO

KITCHEN

SINK

PUMP

SELENOID

FEED (GREEN)

WIRE HARNESS

SEDIMENT

PRE-FILTER

CARBON

PRE-FILTER

CARBON

PRE-FILTER

DRAIN

SADDLE

PLUG

ADAPT-A-VALVE

HOT-WATER

SHUT-OFF

TO

KITCHEN

SINK

COLD-WATER

SHUT-OFF

RO MEMBRANE

POST-CARBON

FILTER

STORAGE TANK

TANK

SHUT-OFF

VALVE

CHECK

VALVE

TRANSFORMER

TANK

(BLUE)

PRESSURE

SWITCH

ADAPT-A-VALVE

BRINE
 (RED)

BRINE (BLACK)

1

5

3

4

2

Five-Stage Standard Unit Connection Steps

Step 1  - 

Remove the existing Automatic Shut-off Valve

Step 2  - 

 Install the Booster Pump and Solenoid between the third stage filter canister and the cap of the reverse osmosis membrane (if 

needed, use provided green tube)

Step 3  - 

 Connect the red flow restrictor tube into the brine elbow

Step 4  - 

Connect the open end of the black hose into the adapt-a-valve connected to the hot water shut-off

Step 5  - 

Splice the pressure switch on the line leading to the tank

Отзывы: