12
Start-up check list
Note
: See also
"Tube replacement " on page 113
o
Ensure that proper connections are achieved between the pump and suction and discharge piping.
o
Ensure proper connection has been made to a suitable power supply.
o
Ensure that the recommendations in the section
"Good pump installation practice " on page 15
are followed.
m-730un-en-08.1
21
Содержание 730 U
Страница 14: ...8 3 Pumphead options 730 pump range 720R 720R RX 720RE 720RE REX 14 m 730un en 08 1 ...
Страница 75: ...m 730un en 08 1 75 ...
Страница 112: ...Refitting 1 2 3 112 m 730un en 08 1 ...