Start-up check list
Note
: See also
"Tube replacement " on page 113
o
Ensure that proper connections are achieved between the pump and suction and discharge piping.
o
Ensure proper connection has been made to a suitable power supply.
o
Ensure that the recommendations in the section
"Good pump installation practice " on page 15
are followed.
13
EtherNet/IP™ control wiring
Never apply mains power to the D-connectors. Apply the correct signals to
the pins shown. Limit signals to the maximum values shown. Do not apply
voltage across other pins. Permanent damage, not covered by warranty, may
result.
Keep 4-20 mA and low voltage signals separate from mains power. Use
separate glanded input cables. Following best EMC practice and use of
shielded glands is recommended.