www.
watersbaths
.co.uk
Fixing...
Step 5
Before final fixing check that the bath is level and
connected to the plumbing system, by adding water
and ensuring it drains away adequately leaving no
puddles and that there are no leaks.
Once checked, half fill the bath to ballast it before
securing it to the floor.
Apply silicone adhesive evenly between the base of
the bath and the floor filling the 1-2mm gap.
10-12 Hours
6,
Содержание Elements Matt
Страница 1: ...Elements Matt Fitting Instructions ...
Страница 10: ...www watersbaths co uk Notes Drawings ...
Страница 11: ...www watersbaths co uk Notes Drawings ...