Water Factory Systems N4000 Series Скачать руководство пользователя страница 6

on air gap faucet. Push on firmly until it seats. 

E)

Feed the air gap tubing and threaded nipple

through sink/counter mounting hole and orient the
faucet as discussed with the customer.

F)

From below sink/counter assemble the white

spacer (open end up, open side toward air gap), flat
washer and hex nut on threaded nipple and tighten
by hand.

G)

Back off on hex nut just enough to slide slotted

washer between white spacer and underside of
sink/counter (with open side of slotted washer closest
to air gap tubes).

H)

After rechecking faucet orientation, tighten hex nut

(9/16” wrench or deep socket) until faucet feels secure.

I)

From above the sink make any minor orientation

corrections by turning the faucet with a padded
adjustable wrench.

NOTE:

Flats on chrome faucet may be used for

tightening with an adjustable wrench. Use care not
to mar chrome finish.

J. Make Initial Tubing Connections (Fig. 1)

For Basement Installation See Appendix

Undercounter Installation:

A)

It is advantageous to make some of the tubing

connections at this time since access to the compo-
nents is much easier now that the undersink area is
less cramped.

B)

The orange 1/4” tubing should already have been

connected to the feed valve with a 1/4” brass com-
pression nut, insert and plastic sleeve.

C)

Connect 1/4” Blue tubing out of faucet to 3/8” x

1/4” union to 3/8” Blue tubing.

D)

Connect the length of blue 3/8” tubing to faucet

fitting.

E)

Route black 3/8” tubing from faucet air gap mod-

ule to drain saddle so that it slopes continuously
downward without loops or low spots. Cut to proper
length and connect to drain elbow by pushing tubing
through nut then hand tightening nut onto body.

F)

Connect length of yellow 1/4” tubing to “Tank”

connection on purification assembly. 

K. Install The Purification Assembly And
Storage Tank

For Basement Installation See Appendix

Undercounter Installation:

The purification assembly is usually mounted

to the right or left sink cabinet sidewall, taking into
consideration the space available and the tank loca-
tion. Generally, the tank is placed in the rear of the
sink cabinet while the purification assembly is posi-
tioned toward the front for better accessibility. 

To mount purification assembly elevate it at

least 2” off the cabinet floor, while keeping level,
mark the location of the mounting holes on the cabi-
net sidewall. Make small pilot holes with an awl or
drill and screw in the two mounting screws, leaving
just enough protruding to allow bracket mounting
slots to slide over them. 

NOTE:

If the cabinet sidewalls are not of solid con-

struction, the purification assembly can be set on
the cabinet floor and held against the sidewall with
the mounting screws. However, the purification
assembly will then need to be lifted from mounting
screws in order to remove filter housings.

The tank may be oriented either vertically or

horizontally. It is generally placed to the rear of the
cabinet but can be set in the front center (between
the sink basins) for ease access if space permits.

L. Make Final Tubing Connections (Fig. 1)

For Basement Installation See Appendix

With all of the components in place, the final

tubing connections can be made. When routing tub-
ing between components, several guidelines should
be observed. 

• Tubing runs should generally follow the contour of  

the cabinets rather then interfere with the cabinet  

storage area. 

• Strive for neatness and an orderly tubing “flow”  

using fasteners (e.g. insulated staples) to secure   
the tubing. 

• Arrange the tubing so there are no sharp bends  

and leave some “play” in the tubing for ease of  
servicing, then cut tubing to the desired length.

• Try to keep the tubing from the purification assembly 

to the tank and faucet as short as practical for good flow.

Undersink Installation

A)

Connect orange 1/4” tubing from feed water

valve to “Feed” connection on purification assembly.

B)

Connect blue 3/8” tubing from faucet to the

“Faucet” connection on purification assembly.

6

Teflon is a registered trademark of E.I. Dupont.

Содержание N4000 Series

Страница 1: ...allation Operation and Maintenance Manual WATER FACTORY SYSTEMS N4000 N4500 N5000 Reverse Osmosis RO Drinking Water Appliance CUNO Incorporated 400 Research Parkway Meriden CT 06450 Tele 203 237 5541...

Страница 2: ...nside Make sure to flush it thoroughly as directed before first use Table Of Contents Installation Instructions A Determine the appliance location B Prepare the area for installation C Prepare the app...

Страница 3: ...and remove compo nents Check that all installation parts are present which includes the purification assembly storage tank faucet installation hardware and tubing Check that the air supply in the empt...

Страница 4: ...the condition of the drain piping espe cially in older homes where the traps and tail pieces can be deceptively thin and frail If in poor condition it is wise to inform the customer that the conditio...

Страница 5: ...air gap module Plumber s putty It is important to understand what is involved in this procedure First the glassy layer of porcelain must be penetrated through to the base metal Second a center disc o...

Страница 6: ...usually mounted to the right or left sink cabinet sidewall taking into consideration the space available and the tank loca tion Generally the tank is placed in the rear of the sink cabinet while the...

Страница 7: ...faucet until a steady stream of water flows Close faucet wait at least 5 minutes and carefully check for leaks Correct as necessary NOTE When the system is first turned on water may intermittently sp...

Страница 8: ...er and hex nut onto the threaded nipple Hand tighten hex nut until faucet feels snug E After rechecking faucet orientation tighten hex nut 9 16 wrench or deep socket until faucet feels secure NOTE Fla...

Страница 9: ...ion and slide faucet handle forward over spout hole to gain access to faucet valve Unscrew the tee bar and slotted bushing to remove valve Clean out obstruction or replace with new valve mechanism as...

Страница 10: ...pipe farther from Properly plug original hole Caution Make sure drain saddle is always installed above before the the trap Fig 4 10 General Basement Installation Schematic Fig 2 Faucet with Air Gap 1...

Страница 11: ...n Saddle Elbow Drain Saddle Mount drain saddle at either location Hole should be located on top of the pipe NOTE Some state and local plumbing codes may prohibit the use of saddle type valves and or d...

Страница 12: ...tubing selected for use with these connectors be of high quality exact size and roundness and with no surface nicks or scratches If it is necessary to cut the tubing use a plastic tubing cutter or sh...

Страница 13: ...only yearly replacement C Recommended maximum sediment prefilter service life is one year When To Replace Carbon Prefilter 4500 and 5000 Series Only The carbon prefilter removes free chlorine from th...

Страница 14: ...low sanitizing and start up procedures for the storage tank and purification assembly outlined in Section IV IV RO Appliance Sanitization To assure the highest quality water from your Water Factor RO...

Страница 15: ...he Purification Assembly Sanitizing the purification assembly generally requires New prefilter cartridge s and filter housing O ring s Water Factory filter wrench or equivalent Common household bleach...

Отзывы: