background image

I. Installation Requirements

CMTRO-75™ RO system, Model CMTRO-75 can be used with most coolers that include a storage tank. Check the 
guidelines below to confirm that the CMTRO-75 system you have selected is the correct system for your water 
conditions and water quality requirements.

Feedwater Criteria

Model

Total Dissolved 

Solids

Hardness

pH

Temperature

Free Chlorine

Iron

Manganese

Hydrogen 

Sulfi de

Water 

Pressure

Daily 

Production*

CMTRO-75

< 2000 ppm

< 350 mg/l

4 - 11

40 - 100°F

(4.4 - 37.8°C)

< 1 mg/l

< 0.1 mg/l

< 0.05 mg/l

none

allowable

40 - 100 psi

(276 - 689 kPa)

23.59 gpd

(89.3 lpd)

per cartridge

Systems are rated at 77°F (25°C), 60 psi (414 kPa), 500 ppm TDS. Actual production rate will depend on local 

temperature, pressure, TDS level and membrane variation. Membrane output is affected by 1.5% for each degree 
above or below 77°F (25°C). Lower temperature means less output, higher temperature means more output. 
(However, systems 

must not

 be installed or operated on hot water lines. Observe temperature limits above). 

Membrane output is also affected by water pressure. 

II. Installation Procedure

Installing the filters.

Remove the CMTRO-75 filter cartridges from their sealed sanitary packages. Note that the “ears” on each cartridge fit 
into slots on the receptacles. Moisten the o-rings with water and twist each cartridge slightly while inserting them into 
the receptacle. The filters lock into place when pressed completely into the receptacle, and turned 1/4 turn to the right. 
Be sure to match icons on the cartridges with the icons on the receptacles. This will ensure that you put the filters in 
the correct position. Installation must comply with state and local plumbing codes.

Mounting the system.

Mounting with bolts, screws, or studs (recommended).

1.  There are two slots with keyholes to provide a variety of options for bolting or hanging the CMTRO-75 system on 
the cooler. In some cases existing screws can be used. Further, there are keyholes for those who desire to install studs, 
bolts, or screws at the required spacing to allow easy removal of the entire system.

Make tubing connections

With the CMTRO-75 system fastened to the cooler, the tubing connections can be made. All connections are made 
with “Push-In” connectors. Refer to the diagram below and instructions on use of the “Push-In” plastic fittings. Use 
care in routing the tubing to ensure that there are no sharp bends or kinks in the tubing.

1.   Connect 3/8" yellow tubing from bracket (labeled tank) to storage tank.

2.  Take 1/4" green tubing & RO Brine Flow control and insert the RO Brine Flow Control in one end of the 1/4" 

green tubing (as shown in Figure). Insert the end of the tubing with the flow control into the drain connection.

3.  Install other end of the long green tubing to drain. Be sure there is a proper air gap between the system & drain 

lines and that local & State plumbing codes are followed.

4.  Connect orange tubing from water supply to inlet port on bracket head.

5.  Connect 3/8" blue tubing from outlet port on head assembly to cooler float/solenoid/reservoir fill connection. 

We recommend the use of high quality tubing. The dimensional inconsistency of low quality tubing can cause leaks at 
the“Push-In” fittings. We also recommend the installation of a ball valve at the point where you tap into the main water 
line.

3

CAUTION

To reduce the risk associated with property damage due to water leakage:

 • 

Do not

 install near water pipes which will be in path of a drilling tool when selecting the position to mount the bracket.

 • Mount 

fi lter in such a position as to prevent it from being struck by other items used in the area of installation.

  •  Ensure that the location and fasteners will support the weight of the system.

Содержание CoolerMATE CMTRO-75

Страница 1: ...olerMATE Reverse Osmosis Systems Model CMTRO 75 System tested and certified by NSF International against NSF ANSI Standard 42 and Standard 58 for the claims specified on the Performance Data Sheet Installer Please leave this manual with owner operator End User Please retain for operation and future maintenance instructions ...

Страница 2: ...37 6501 24 hours To reduce the risk associated with ingestion of water contaminated with sanitizer After installation sanitizer MUST be flushed from the system before first use as directed within the installation instructions To reduce the risk of injury associated with household bleach Read and follow manufacturers directions and cautions Keep out of reach of children DO NOT intermix with other c...

Страница 3: ...ing to cooler Filter Icon Feedwater Inlet 1 4 Green Polyethylene Tubing with Flow Control Assembly To StorageTank 3 8 Yellow Polyethylene Tubing Back View of Bracket Drain Line Green Tubing Flow Control Assembly Back View of RO Cartridge 1 2 Flow Control RO Drain Line Construction 1 Insert the thin flow control tubing with attached bushing and stop into the 1 4 green tubing 2 Insert the green tubi...

Страница 4: ...There are two slots with keyholes to provide a variety of options for bolting or hanging the CMTRO 75 system on the cooler In some cases existing screws can be used Further there are keyholes for those who desire to install studs bolts or screws at the required spacing to allow easy removal of the entire system Make tubing connections With the CMTRO 75 system fastened to the cooler the tubing conn...

Страница 5: ...he end of the threaded tank stem Install the 3 8 x 1 4 tank valve onto the threaded tank stem Do not overtighten 2 Disconnect the 3 8 yellow tubing from the back of the filtration assembly and connect one end of it into the tube fitting located on the tank valve 3 Connect the other end of the 3 8 yellow tubing to the 3 8 x 1 4 union connector included in the tank sanitization kit 4 Connect the fre...

Страница 6: ...ion and Maintenance Instructions Replacing the Filter Cartridges The life of the prefilter cartridge generally depends on the local water conditions i e sediment rust and or chlorine levels while the life of the postfilter cartridge s is generally determined by the length of service It is recommended that the cartridges be replaced as noted below When to Replace the Sediment Carbon Prefilter Cartr...

Страница 7: ...completely depressurize 2 Make sure that there is some slack in the green tubing connected to the fitting at the bottom of the RO membrane cartridge Twist the cartridge 1 4 turn to the left so that the tubing connection is accessible See illustration on the right 3 Remove the green tubing by depressing the small white collet and pulling the tubing away from the fitting Note It is advisable to chec...

Страница 8: ...800 733 1199 Worldwide 1 203 237 5541 Fax 1 203 238 8701 www waterfactorysystems com www cuno com 2009 3M Company All rights reserved CUNO CMTRO 75 and Water Factory Systems are trademarks of 3M Company used under license NSF is a trademark of NSF International a 3M company ...

Отзывы: