background image

 

 

10 

BLASTER SOFT SET UP 

 

NOTE: The Blaster Soft come factory set, only to be changed by trained/qualified technicians.  Changes may be 
necessary should the water quality change.   
 

First Stage of Settings

 

 

Instructions 

Description 

1.  Set time clock 

As per normal operation 

2.  Press 

NEXT

 and 

DOWN

 

(or Minus Button) together 

Board will go to the next setting 

3.  Press 

NEXT

 and 

DOWN

 

together a second time 

Screen will flash this is the correct setting 

4.  Press 

NEXT

  

ALR will flash... press plus or minus button until it says OFF 

5.  Press 

NEXT

 

dp will flash… press plus or minus button until it says OFF 

6.  Press 

NEXT

 

Should read “Fill”… press plus or minus button until fill is displayed on the screen 

7.  Press 

NEXT

 

Should read “Backwash”… press plus or minus button until backwash is displayed on screen 

8.  Press 

NEXT

 

Should read “Brine Down”… press plus or minus button until Brine Down is displayed on 
screen 

9.  Press 

NEXT

 

Should read “Rinse”… (this is just before ozone draw)press plus or minus button until Rinse 
is displayed on screen 

10.  Press 

NEXT

 

Should read “Brine Down”… press plus or minus button until Brine Down is displayed on 
screen 

11.  Press 

NEXT

 

Should read “End”… press Next until End is displayed on screen 

12.  Press 

NEXT

 

Screen will go back to clock setting 

 

Second Stage of Settings

 

 

Instructions 

Description 

1.  Press 

NEXT

 and 

DOWN

 

(or minus button) together 

Should flash “Filtering or Softening”… press plus or minus button until Softening is displayed 
on screen 

2.  Press 

NEXT

 

Should flash “ Fill”…Set at 9.5 lbs (or higher if iron count is high)   

3.  Press 

NEXT

  

Should flash “Backwash” … Set between 8 and 12 minutes 

4.  Press 

NEXT

 

Should flash “Brine Draw Down”… Set for 60 minutes 

5.  Press 

NEXT

 

Should flash “Rinse”… Set for 4 to 6 minutes 

6.  Press 

NEXT

 

Should flash “Brine Down”… Set for 30 up to 60 minutes 

7.  Press 

NEXT

 

Should flash “Capacity”… (unit size) usually set for 30,000 grains 

8.  Press 

NEXT

 

Should flash “Auto”… press plus or minus buttons until Auto is displayed on screen 

9.  Press 

NEXT

 

Should flash “Normal”… press plus or minus buttons until Normal is displayed on screen 

10.  Press 

NEXT

 

Should flash “Relay” … Set for “ON”  (NOTE: This can be set in time or gallons, set for time) 

11.  Press 

NEXT

 

Screen Should flash… Set the time you want the ozone to come on, you this by adding all 
the cycles together.  Add fill time, backwash time, brine draw time, and rinse time.  You may 
need to put the unit through a manual regeneration to see each time, write them down and 
add them up.  For example if you have 84 minutes in time before your ozone brine draw set it 
for 2 more minutes = 86 minutes 

12.  Press 

NEXT

 

Screen should flash… Set length of Ozone between 30 to 60 minutes 

13.  Press 

NEXT

 

Should flash “Call”…leave OFF 

14.  Press 

NEXT

 

Screen will go back to clock setting 

 

 

NOW ADJUST REGENS... EXAMPLE BAD WATER 10 Minute backwash (our example) and 60 minutes 
brine… now you may want it to go off every day…or every second day…. So follow this instruction 

 

Press…Next and PLUS (+)… at the same time.  “hardness “NA” will flash 

 

Press… NEXT….”regen” day will flash…. Press the plus (+) or minus (-) for the day to regen... if bad water 
set it at 1… this means every day it will go off. 

 

Press, NEXT… back to clock setting. 

NOTE

:  Your Blaster ozone draw time setting does not work on cycles, it works on time.  This bases of design is 

simple, however do not set the relay too soon, it is better to be 2 to 3 minutes longer than actual cycles add up to.  If 
you make it too short and the valve is in rinse the ozone will come on but won’t shut off when brine draw starts.  
Lastly, when the unit has finished all the cycles and goes back to service mode the ozone will automatically shut off.   

Содержание Blaster Soft

Страница 1: ...Blaster Soft System Owner s Manual CANADIAN ADDRESS 92 Commerce Park Dr Unit 2 Barrie ON L4N 8W8 Canada www waterdepot com...

Страница 2: ...the performance of the Blaster then you should call for service Your dealer is trained in testing water and setting your machines according to the recommendation of the manufacturer Failure to provid...

Страница 3: ...Drawings and Part Numbers 17 Front Cover and Drive Assembly 18 Drive Cap Assembly Downflow Piston Upflow Piston Regenerant Piston and Spacer Stack Assembly 19 Drive Cap Assembly Downflow Piston Regera...

Страница 4: ...y should flash all wording then flash the software version e g 154 and then reset the valve to the service position All plumbing should be done in accordance with local plumbing codes The pipe size fo...

Страница 5: ...s leaking tightening the nut will not stop the leak Remove the nut remove the fitting and check for damage or misalignment of the o ring Do not use pipe dope or other sealant on threads Teflon tape mu...

Страница 6: ...6...

Страница 7: ...s to PM the right Access the mode by pressing during p m hours Simultaneously press SET HOUR and UP simultaneously for SET HOUR and DOWN to return to 3 seconds normal operation The user can initiate m...

Страница 8: ...28 minutes DAY OVERRIDE IS SET FOR 3 DAYS Reminder The unit must go off every 3rd day if you want to remove Sulphur and Iron etc You can custom change anything you want but make sure the relay does n...

Страница 9: ...e the system sooner than when the system calls for it usually referred to as a manual regeneration There may be a period of heavy water usage because of guests or a heavy laundry day To initiate a man...

Страница 10: ...4 to 6 minutes 6 Press NEXT Should flash Brine Down Set for 30 up to 60 minutes 7 Press NEXT Should flash Capacity unit size usually set for 30 000 grains 8 Press NEXT Should flash Auto press plus or...

Страница 11: ...11...

Страница 12: ...12...

Страница 13: ...13 Example Brine Line Installation...

Страница 14: ...rounding clips and remove from generator 4 Run warm water through the inlet tubing until the water from the outlet tubing runs clear and free or particulates 5 Use compressed air to completely dry the...

Страница 15: ...15...

Страница 16: ...16 Platinum Drawings and Part Numbers...

Страница 17: ...V 12V EU CLK V3186UK WD1 AC ADAPTER 220 240V 12V UK CLK V318601 WD1 AC ADAPTER CORD ONLY Relay Specifications To insure proper fit and correct operation the following relay and relay socket manufactur...

Страница 18: ...Downflow ASY 1 4b CLK V301101 WD1 Piston Upflow ASY 5 CLK V3174 WD1 Regenerant Piston 1 6 CLK V3135 O ring 228 1 7 CLK V3180 O ring 337 1 8 CLK V3105 O ring 215 Distributor Tube 1 Not Shown CLK V3001...

Страница 19: ...O ring 228 1 7 CLK V3180 O ring 337 1 8 CLK V3358 O ring 219 Distributor Tube Opening 1 32 1 CLK V3357 O ring 218 Distributor Tube Opening 32mm Not Shown CLK V3020 WD1 25 Body ASY Downflow Distributo...

Страница 20: ...01F WD1 INJECTOR ASY F BLUE CLK V30101G WD1 INJECTOR ASY G YELLOW CLK V30101H WD1 INJECTOR ASY H GREEN CLK V30101I WD1 INJECTOR ASY I ORANGE CLK V30101J WD1 INJECTOR ASY J LIGHT BLUE CLK V30101K WD1 I...

Страница 21: ...This part is required for backwash only systems 2 CLK H4615 Elbow Locking Clip 1 3 CLK JCPP6 Polytube insert 3 8 1 4 CLK JCPG6PBLK Nut 3 8 1 5 CLK H4613 Elbow Cap 3 8 1 6 CLK V3163 O ring 019 1 7 CLK...

Страница 22: ...for CLK V3162013 WD1 DLFC 1 3 gpm for CLK V3162017 WD1 DLFC 1 7 gpm for CLK V3162022 WD1 DLFC 2 2 gpm for CLK V3162027 WD1 DLFC 2 7 gpm for CLK V3162032 WD1 DLFC 3 2 gpm for CLK V3162042 WD1 DLFC 4 2...

Страница 23: ...ion Quantity 1 CLK V3151 WD1 Nut 1 QC 1 2 CLK V3003 WD1 Meter ASY 1 3 CLK V311801 WD1 Turbine ASY 1 4 CLK V3105 O ring 215 1 5 CLK V300301 WD1 Meter Plug ASY 1 6 CLK V3013 Mixing Valve Optional Order...

Страница 24: ...g 215 2 3 CLK V3105 O Ring 215 2 4 CLK V3149 WD1 Fitting 1 PVC Male NPT Elbow 2 4 CLK V3189 WD1 Fitting 1 PVC Solvent 90 2 Order No CLK V300702 Description WD1 Fitting 1 Brass Sweat Assembly Order No...

Страница 25: ...2 3 CLK V3105 O Ring 215 2 4 CLK V3164 WD1 Fitting 1 Plastic Male NPT 2 4 CLK V3317 WD1 Fitting 1 Plastic Male NPT 2 Order No CLK V300704 Description WD1 Fitting 1 Plastic Male NPT Assembly Order No...

Страница 26: ...pass Cap 2 6 CLK V3147 WD1 Bypass Handle 2 7 CLK V3148 WD1 Bypass Rotor Seal Retainer 2 8 CLK V3152 O ring 135 2 9 CLK V3155 O ring 112 2 10 CLK V3156 O ring 214 2 Not Shown Order No CLK V319101 Descr...

Страница 27: ...319301 Although no tools are necessary to assemble or disassemble the valve the WS1 wrench shown in various positions on the valve may be purchased to aid in assembly or disassembly Econo Air Birm Ins...

Страница 28: ...Listen to back wash 1 Check for obstruction in backwash Check flow restrictor Regenerate more often 2 Check the ozone generator is working 3 Clean the ozone tube Overview Most service should be aroun...

Страница 29: ...29...

Страница 30: ...30...

Страница 31: ...31...

Страница 32: ...32...

Отзывы: