background image

21

Maintenance

FLOW CONTROL

The flow control is required for proper operation of the

Reverse Osmosis system. See Fig. 29. The flow control,

located inside the push-in elbow fitting on the drain port of

the system housing, keeps water flowing through the mem-

brane at the required rate. This ensures that the system pro-

duces the best quality product water.
Periodically check the flow control to be sure the small hole

through it is clean and unrestricted. 
If the flow control requires service, review the exploded view

in Fig. 29. Assemble and disassemble as shown. If the flow

control remains in the manifold when the push-in elbow fit-

ting is removed, you will need to remove the drain port’s col-

let and o-ring, as shown in the next section, to retrieve it.

ChANGE COLLET AND O-RING

1

. Remove the collet and o-ring from the fitting with a small

screwdriver. Do not scratch the internal walls of the collet

port. See Figs. 30 & 31.

2

. Clean collet port, lubricate with silicone-based lubricant,

and insert the o-ring seal into the bottom of the port. See

Figs. 30 & 31.

3

. Push the collet inward until it locks in place. See Figs. 30

& 31.

ChANGE BATTERY

To change battery, complete the following steps. 

1

. Remove the screw on the right side of the faucet base.

See Fig. 32.

2

. Press the battery housing upwards from the front faucet

base until it releases from the faucet base. See Fig. 32.

3

. Replace the battery (CR 2032 or equivalent). Place bat-

tery into the holder with the positive (+) side facing the

back of the holder.

4

. When the battery is installed the LED will flash six times

and turn off. This indicates the battery is fully charged.

After the six flashes, the timer enters the 6 month time

cycle. If it repeatedly flashes two times, it is not a fully

charged battery.

5

. Re-install the battery housing and firmly tighten the

mounting screw. See Fig. 32.

Battery

Housing

Battery,

negative (–)

side facing

the front

Faucet

Base

Screw

FIG. 32

Change Collet and O-Ring

FIG. 30

Collet

Fitting

O-Ring Seal

Push o-ring seal into 

bottom of port then

follow with collet.

Disconnect Tubing

FIG. 31

Tubing

Collet (depress to

remove tubing)

To

Drain

FIG. 29

Flow Control

Insert

Push-in

Elbow Fitting

1/4” Red

Tubing

Содержание EcoPure ECOP30

Страница 1: ...2 58 See performance data on pages 27 28 for details If you have any questions or concerns when installing operating or maintaining your reverse osmosis system call our toll free number 1 800 693 1138...

Страница 2: ...ing 8 Step B Install Reverse Osmosis Drain 9 10 Step C Install Reverse Osmosis Filter Assembly 11 Step D Install Storage Tank 11 Step E Install Reverse Osmosis Faucet 12 13 Step F Connect Tubes 14 15...

Страница 3: ...er the system This system is certified for cyst reduction and may be used on disinfected water that may contain filterable cysts Arsenic Reduction This system shall only be used for arsenic reduction...

Страница 4: ...r Reverse Osmosis Drinking Water System is shipped complete in one carton Remove all items from your shipping carton Check all items against the packing list below Note any items lost or damaged in sh...

Страница 5: ...point is needed for drain water from the Reverse Osmosis system REMOTE INTERIOR LOCATION The Reverse Osmosis Filter Assembly and storage tank may also be installed in a remote interior location away...

Страница 6: ...sis Drain Soft water to Reverse Osmosis System Hard Water to House Main Shutoff Valve Storage Tank Water Meter Reverse Osmosis System To Faucet Floor Drain Air Gap see p 11 Typical Under Sink Installa...

Страница 7: ...d filter assembly into planned location Check position of items and space required for proper installation Ensure tubes may be routed without kinking 3 Remove tank and filter from planned location and...

Страница 8: ...st provide a leak tight connection to the Reverse Osmosis 1 4 tubing Locate the cold water line in the sink cabinet It is recommended but not required that the cold water line be soft water Complete t...

Страница 9: ...trap See Fig 9 Make sure that the Q C fitting is toward the direction of the RO faucet See Fig 10 NOTE Locate so that the drain tubing from the Reverse Osmosis faucet will run straight to the adaptor...

Страница 10: ...e with an adequate length of tubing to reach the drain point Refer to Step F later in the manual on how to disconnect and connect tubing NOTE A flow control insert is located inside the elbow fitting...

Страница 11: ...ur later in the assembly 4 Place the storage tank next to the Reverse Osmosis Assembly The tank can be placed upright or on its side INSTALL REVERSE OSMOSIS FILTER ASSEMBLY The Reverse Osmosis Filter...

Страница 12: ...s adequate tube routing space between the faucet and filter assembly 4 If drilling is needed drill a 1 1 4 diameter hole in the mounting surface IMPORTANT Drilling holes into countertops and sinks sho...

Страница 13: ...faucet barb fitting on faucet See Figs 17 20 21 D Pull on the tubing to be sure it is held firmly in the fit ting 6 Mount the faucet body onto the faucet base 1 4 turn FAUCET ELECTRONICS Inside the fa...

Страница 14: ...collet until it engages the o ring See Fig 20 Continue pushing until the tube bottoms out against the back of the fitting See Fig 21 Do not stop pushing when the tube engages the o ring Failure to fo...

Страница 15: ...way into the fitting See Figs 20 21 5 Pull on the tube to be sure it s held firmly in the fitting CONNECT BLACK TUBE FROM REVERSE OSMOSIS FAUCET TO DRAIN ADAPTER 1 Locate the 3 8 black tube attached...

Страница 16: ...e Figs 14 and 25 6 Sanitizing the system will be completed during the pressure test and purging steps on the following page NOTE The bleach must be removed from the system before drinking the water Se...

Страница 17: ...and do not per mit the use of saddle valves If you live in the state of Massachusetts review plumbing code 248 CMR of the Commonwealth of Massachusetts before proceeding with the installa tion PURGING...

Страница 18: ...stfilter before going to the Reverse Osmosis faucet See Fig 27 The postfilter is an activated carbon type filter Any remaining tastes and odors are reduced from the product water Clean high quality dr...

Страница 19: ...to the storage tank 5 Drain water with dissolved solids leaves the Reverse Osmosis membrane and flows to the drain 6 Faucet is activated 7 Processed water leaves the storage tank and flows to the post...

Страница 20: ...the cartridge membrane and causes pin hole leaks It s time to replace the Reverse Osmosis cartridge when the pro duction rate and or quality of product water drops Product water may begin to taste di...

Страница 21: ...and insert the o ring seal into the bottom of the port See Figs 30 31 3 Push the collet inward until it locks in place See Figs 30 31 ChANGE BATTERY To change battery complete the following steps 1 Re...

Страница 22: ...ilter or Reverse Osmosis membrane cartridges plugged with sediment Correction Replace the prefilter cartridge If rate does not increase replace the postfilter cartridge and Reverse Osmosis membrane ca...

Страница 23: ...ee pages 14 15 Cause Tubing nicked Correction Remove tube from connection Remove nicked portion by cutting tube to shorter length Reinsert in connection See pages 14 15 If removing the drain line leav...

Страница 24: ...24 Exploded View 22 21 18 17 16 15 14 13 11 1 2 3 4 8 9 7 5 6 1 4 red tubing 12 10 8 20 23 19...

Страница 25: ...utomatic Shutoff Kit incl Key No 7 4 of Key No 6 6 of Key No 5 5 Screw 6 req d 6 Washer 4 req d 7 Automatic Shutoff Cover Assembly 7333179 Diaphragm Kit includes Key Nos 9 10 2 of Key No 8 8 Diaphragm...

Страница 26: ...xcept normal shipping and installation charges Labor to maintain the equipment is not part of the warranty Filters and membranes are not covered by the warranty TO OBTAIN WARRANTY PARTS SIMPLY CALL 1...

Страница 27: ...ur water supply See elsewhere in this owner s manual for further instructions on filter replacement system installation operating procedures and warranty The maintenance instructions must be followed...

Страница 28: ...340 40 88 Sulfate7 800 10 2508 780 12 98 Tannin7 3 0 10 1 08 2 9 0 1 97 Zinc7 15 10 5 08 15 0 25 98 1 Milligrams per liter which is equivalent to parts per million PPM 2 Tested by NSF International ac...

Страница 29: ...ne minute any trivalent arsenic will be converted to pentavalent arsenic and reduced by this RO Other water treat ment chemicals such as ozone and potassium permanganate will also change trivalent ars...

Отзывы: