Wasserhaus QuaRO Series Скачать руководство пользователя страница 13

Wasserhaus Deutschland GmbH· Max-Wundel-Strasse 12 · D-14469 Potsdam · 

Tel. 0331 – 505 79 43 · Fax 0331 – 505 79 52 

www.wasserhaus.de · e-mail: [email protected] 

page 

13 

 

 

Some Important Installation Notes 

 

No tools are needed to connect the tubing. Just insert tubing into the fitting all the way. The 
RO System uses so-called John-Guest (JG) type fitting or quick-connect fitting. To make a 
connection to JG type fitting, cut tube straight and square, then insert tube all the way, and 
pull it to lock it. 

 

Connecting standard JG type push-in fittings 

 

Connecting standard JG type push-in fittings 

(Push up to pipe) 
 

Push the pipe into the fitting, to the pipe stop. The collet (gripper) has stainless steel teeth 
which hold the pipe firmly in position whilst the 'O' Ring provides a permanent leak proof 
seal. 
Pull on the pipe to check it is secure. It is good practice to test the system prior to leaving site 
and/or before use. 

 

Disconnecting standard JG type push-in fittings 

 

Disconnecting standard JG type push-in fittings 

(Push in collet and remove tube) 
 

Ensure system is depressurized before removing fittings. Push in the collet against the face 
of the fitting. With the collet held in this position the pipe can be removed. The fitting can then 
be re-used. 

 

 

Installation 

 

Your  RO  system  is  made  for  installation  under  the  sink,  in  a  basement  or  other  location, 
depending  on  available  space.  Do  not  install  unit  where  temperatures  fall  below  freezing; 
otherwise, damage will result. 
 
We recommend you to call a plumper to have your system professionally installed. WRONG 
MOUNTING  MAY  RESULT  IN WATER  DAMAGE  IN  YOUR  HOUSE!  The  connecting  parts 
have  been  proven  a  million  fold  and  are  standard  compliant.  If  you  would  like  to  have 
different connecting parts, you can buy them in our store or at every specialized dealer. 
 
 

Содержание QuaRO Series

Страница 1: ...Max Wundel Strasse 12 D 14469 Potsdam Tel 0331 505 79 43 Fax 0331 505 79 52 www wasserhaus de e mail info wasserhaus de page 1 Installation and User Manual Residential Reverse Osmosis Water Filter Sys...

Страница 2: ...The pre filters remove sediment and chlorine from the water supply before they can enter the RO membrane The post filter removes any taste or odours that may remain in the water after passing through...

Страница 3: ...0 F 4 C min 100 F 38 C max Temperatures below the minimum will freeze and crack the R O membrane and filter housings Above 100 F 38 C the membrane will rapidly deteriorate The quality temperature and...

Страница 4: ...l This reverse osmosis system works on water pressure of 2 8 bar 32 psi minimum to 6 bar 87 psi maximum You must install a pressure reducing valve in the water supply pipe to the reverse osmosis syste...

Страница 5: ...he RO system will not make product water as it should and substantially reduced filter and membrane life will result CAUTION Chlorine in the water will destroy the RO membrane Most cities add chlorine...

Страница 6: ...x 0331 505 79 52 www wasserhaus de e mail info wasserhaus de page 6 5 Installation manual RECOMMENDED TOOLS Variable speed drill 1 8 7 16 and drill bit 4 6 10 or 13 drill bit 5 8 9 16 17 24 32 open en...

Страница 7: ...Wasserhaus Deutschland GmbH Max Wundel Strasse 12 D 14469 Potsdam Tel 0331 505 79 43 Fax 0331 505 79 52 www wasserhaus de e mail info wasserhaus de page 7 QuaRO Pur Parts Diagram...

Страница 8: ...Wasserhaus Deutschland GmbH Max Wundel Strasse 12 D 14469 Potsdam Tel 0331 505 79 43 Fax 0331 505 79 52 www wasserhaus de e mail info wasserhaus de page 8 QuaRO Power Parts Diagram...

Страница 9: ...Wasserhaus Deutschland GmbH Max Wundel Strasse 12 D 14469 Potsdam Tel 0331 505 79 43 Fax 0331 505 79 52 www wasserhaus de e mail info wasserhaus de page 9 QuaRO Plus Parts Diagram...

Страница 10: ...Membrane Housing Double O ring E Storage Tank 2 3 2 or 4 gallons F Inline Granular Carbon Cartridge G Inline Mineralizing Cartridge H Pressure Pump 1 Brass Water Feeder 3 8 or 2 Elbow JG 3 Elbow or C...

Страница 11: ...en when the storage tank is nearly full This dramatically improves the efficiency of the membrane and overall quality of your water as well as increasing the pressure and related volume of stored wate...

Страница 12: ...ple for a connection scheme of a permeate pump in QuaRO PUR ECO RO unit The permeate pump is connected in the same way in QuaRO PLUS system The only difference is the additional mineralization cartrid...

Страница 13: ...he pipe to check it is secure It is good practice to test the system prior to leaving site and or before use Disconnecting standard JG type push in fittings Disconnecting standard JG type push in fitt...

Страница 14: ...he installation is responsible for the compliance with effective regulations PLACE OF INSTALLATION Install the tank and the filter block in a vertical position under the sink If there is not enough sp...

Страница 15: ...each sump 1 8 turn to left and pull away from head to remove b Pull pre filters gently away from head remove shrink wrap and re install open end of pre filters on to head boss c To replace sumps alig...

Страница 16: ...e and turn it off 2 Open cold water faucet to release pressure and make sure there is no water running 3 Mount the brass water feeder 3 8 between cold water shut off valve and cold water tube to your...

Страница 17: ...t the complementary piece and clamp them together with the two bolts Tighten the two bolts evenly 5 Connect Black tubing to drain saddle valve Step 3 Installing the dispensing faucet The faucet should...

Страница 18: ...bit 4 Enlarge the hole using 7 16 bit Keep bit well oiled and cool then drill slowly 5 File or clean the surrounding area and remove the masking or duct tape NOTE the metal chips on porcelain will sta...

Страница 19: ...Micropur MC10 T capsule from the manufacturer Katadyn Before you start to mount the storage tank you must insert the disinfection capsule into the opening of the storage tank Then mount the tank ball...

Страница 20: ...or the water to flow through the system and purge all the air trapped inside the system 6 After 10 minutes turn the storage tank valve to the ON position handle is parallel to the tubing 7 Turn the RO...

Страница 21: ...h the newly installed system 10 Exchange of filters RO membrane CAUTION Any Replacement filters or membranes not recommended by the factory can cause severe damage to the system and void all warrantie...

Страница 22: ...s periodically and maintain a service record to establish a maintenance schedule that is unique to your water conditions 8 Disinfect the storage tank as described on page 19 9 Open tank ball valve 10...

Страница 23: ...ing of the membrane may need to be lubricated with a water soluble lubricant Then insert new membrane making sure it is fully seated into the bottom end and use your thumbs to apply pressure to the me...

Страница 24: ...ax 0331 505 79 52 www wasserhaus de e mail info wasserhaus de page 24 To change the post filter stage 5 follow these instructions 11 Service address Wasserhaus Deutschland GmbH Max Wundel Strasse 12 1...

Страница 25: ...product water Solution Replace the pre filter cartridge If the production rate does not improve replace the post filter stage 5 the RO membrane cartridge and the flow control valve Suggestion You sho...

Страница 26: ...oes not increase replace the post filter cartridge RO membrane cartridge and flow control valve on drain line Increase water pressure precondition the water etc as needed to conform before doing maint...

Страница 27: ...he storage tank or to the post filter and RO faucet Rejected water with the dissolved solids and organic matter is routed through the flow control valve and to the drain Storage tank The storage tank...

Отзывы: