Warner Shelter Systems Limited
PAGE 10
•
For inclement weather
,
Guy Ropes are recommended.
Summary
Guy Rope Installation
10. Insert Centrepole through the centre socket.
11. Install Flag from outside.
12. Slide Centrepole over the Cross Cable inter-
secting point.
13. Remove and fold Drop Sheet.
14. Install remaining Posts.
15. Drive Stakes through each Post Base.
16. Tension each toggle rope.
17
Install Guy Ropes, Walls, Joiners.
18. Make final inspection to ensure everything
is in operational condition.
19. Clean up site.
1.
Check parts.
2.
Assemble Corner 90°, 9’ 3” and 5’ Eve Tubes,
T-plus and Midjoints to form upper frame.
3.
Install Cross Cables.
4.
Spread Drop Sheet over Cross Cables to
protect the Tent Top.
5.
Unfold Tent Top.
6.
Attach Tent Top webbings to corner loops.
7.
Insert T-joint hooks through grommets.
Temporarily secure with S-hook.
8.
Install Posts. Secure with Lock-Pin and insert
the s-hook of the toggle rope into the hole
in the Post Base.
9.
Move Drop Sheet to clear the Cross Cable
intersection area.
..\graphicshome\Marquee\Manuals\MQ2040T\MQ2040T Manual 2007.FH11
Attach Guy Ropes to corner loop
(as required)
To take down the tent, reverse the preceding installation steps.
Guy Rope
Attach Guy Rope
to corner loop
as required
Содержание MQ2040T
Страница 13: ...Warner Shelter Systems Limited PAGE 13 Notes graphicshome Marquee Manuals MQ2040T MQ2040T Manual 2007 FH11 ...
Страница 14: ...Warner Shelter Systems Limited PAGE 14 Notes graphicshome Marquee Manuals MQ2040T MQ2040T Manual 2007 FH11 ...
Страница 15: ...Warner Shelter Systems Limited PAGE 15 Notes graphicshome Marquee Manuals MQ2040T MQ2040T Manual 2007 FH11 ...