5 April 2019
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm
………….
Copyright ©
8
Test Report Number
Date of Report
04/1039
20
th
July 2004
04/1040
20
th
July 2004
04/1041
20
th
July 2004
TAPER TOP FREESTANDING FLUEKIT SECTION VIEW
Note :
External requirements fefer to AS/NZS2918:2001 4.9.1
Install flue system to AS/NZS2918:2001
When using a rubber or Bitumen flashing (Butynol , Dek-
tite) an additional flue pipe baffle is required.
All external air vents & ceiling penetrations must
be bird proofed with permanently fixed screens.
All flashing to comply with E2.
All external air vents and ceiling penetrations are to be
vermin and rodent proof.
Note: FLUE SYSTEMS casing.
Flue system may require to be eoubled lined to comply.
Ref ASNZS:2918:2001 4.3 rlue pipe casing
Freestanding Taper
Top Firebox
SI
780
FST
SI
780T
FST
SI
900
FST
SI
1100
FST
Top of Cabinet to Ceiling
Y
850
770
850
780
Minimum Ceiling Ceight
Z
1700
1700
1900
1900
Note:
A minimum height must be maintained from the
top of the cabinet to the ceiling as per graph
below.
Y
Z