background image

Commissioning

This appliance must be commissioned. Failure to commission the 

boiler will invalidate the warranty. After commissioning ensure that 

the attached guarantee registration card is completed and returned.

Servicing

To ensure continued reliable operation and fuel economy 

it is recommended that the boiler is serviced annually 

by a Warmflow or an OFTEC registered technician.

NI Customers Only

Warmflow Engineering Service division (NI) provides an 

excellent back-up service, operating a team of OFTEC trained 

engineers who can meet all the servicing, commissioning 

and breakdown requirements for your appliance.

Telephone: 0870 240 6532

Fax: 028 9262 2827

Email: [email protected]

Web: www.warmflow.co.uk

For Parts, Service Technical & Warranty Contact

Great Britain & N Ireland, Tel: 0870 240 6532

Republic of Ireland, Tel: 048 9262 1515

This manual is accurate at the date of printing (E&OE) but will be superseded and should be disregarded 

if specifications and/or appearances are changed in the interests of continued product improvement.

Code 3307

ISSUE 1

JAN 07

LISBURN

Lissue Industrial Estate, Moira Road,

Lisburn, Co Antrim, N Ireland, BT28 2RF

Tel: (028) 9262 1515

Fax: (028) 9262 0869

Email: [email protected]

[email protected]

[email protected]

MANCHESTER

144 Bradford Road,

Manchester, M40 7AS

Tel: (0161) 205 4202

Fax: (0161) 205 4818

Email: [email protected]

[email protected]

[email protected]

Содержание U Series

Страница 1: ...ency Condensing Boilers Models covered by this manual U Series Utility U70HE U90HE U120HE Utility Pumped UP70HE UP90HE Utility System US70HE US90HE Utility Combi UC70HE UC90HE K Series Kabin Pak K70HE...

Страница 2: ...ance Telephone 0870 240 6532 Fax 028 9262 2827 Email service warmflow co uk Web www warmflow co uk For Parts Service Technical Warranty Contact Great Britain N Ireland Tel 0870 240 6532 Republic of Ir...

Страница 3: ...Gravity System 39 4 2 Two Pipe System 40 4 3 De aerator System 40 4 4 One Pipe Lift System 41 5 0 Flues 5 1 Installation of Balanced Flues 42 5 2 Conventional Flues 44 5 3 Flue Terminal Positions 44 6...

Страница 4: ...hile the boiler is still hot as this will cause damage to the thermostat Burner Lockout When the pressure jet oil fired burner stops after failing to fire the red reset button will be illuminated This...

Страница 5: ...which has a cut off point of 110 C this is factory set and is not adjustable The high limit thermostat is located under the control panel to the left hand side press button to reset As standard the p...

Страница 6: ...dinary plastic pipe eg plastic overflow pipe directly into the household drain or soak away Any blockage in the drain could lead to an alteration in the combustion settings because of partially blocke...

Страница 7: ...ust be fitted with a suitable chemical scale preventer eg Fernox Quantomat or Combimate alternatively contact Warmflow for further details 5 That the flow from any one hot water outlet does not exceed...

Страница 8: ...cturer s guarantees are void if the appliance is not installed and commissioned in accordance with the recommendations made herein 1 2 General Requirements The installation of the boiler must be in ac...

Страница 9: ...duced even if the heat store is up to temperature 1 3 1 Pump Over Run Where there is a build up of excess heat in the boiler primary heat exchanger and the central heating has not been selected then t...

Страница 10: ...emovable 1 5 2 U Series Utility Pre Wired UHE Key Components 1 Heat Exchanger 2 Condensing Unit 3 Auto Air Vent 4 Service Door 5 Dual Safe Thermostat 6 Heat Exchanger Baffles 7 Service Door 8 Service...

Страница 11: ...t 10 Heat Exchanger Baffles 11 Service Door 12 Service Door Cover 13 Condensate Trap 14 Riello RDB 2 2 Burner 15 Heating Flow Connection 16 Heating Return Connection 1 5 4 U Series Utility System USHE...

Страница 12: ...or 10 Service Door Cover 11 Control Panel 12 Expansion Vessel 13 Riello RDB 2 2 Burner 14 Heat Exchanger Baffles see dimension drawing for details of connections 1 5 6 U Series Utility Combi UCHE Cont...

Страница 13: ...s Kabin Pak Casing Components 1 Boiler Assembly 2 Top Casing removable 3 Flue Assembly removable 4 Rear Flue Casing 5 Blanking Plug removable 6 Rear Casing removable 7 Side Casing 8 Front Casing remov...

Страница 14: ...n 12 Heating Return Connection 1 5 9 K Series Kabin Pak Pumped KPHE Key Components 1 Heat Exchanger 2 Condensing Unit 3 Pipework Assembly 4 Pressure Relief Valve 5 Auto Air Vent 6 Circulating Pump 7 A...

Страница 15: ...1 5 11 K Series Kabin Pak Combi KCHE Key Components 1 Heat Exchanger 2 Heat Store 3 Condensing Unit 4 Service Door 5 Pipework Assembly 6 Plate Heat Exchanger 7 Twin Head Pump 8 Condensate Trap 9 Servi...

Страница 16: ...2 K Series Kabin Pak Combi KCHE Control Panel Control Thermostat Mains On Lamp Green High Limit Tripped Lamp Yellow Burner Lockout Lamp Red HW On Off Switch CW On Off Switch High Limit Thermostat Rese...

Страница 17: ...ted CH Pump Only Runs Room Stat Satisfied Boiler Stat Satisfied Boiler Limit Stat Tripped Burner Fires DHW Pump Only Runs HW Limit Stat Satisfied Boiler Limit Stat Tripped Burner Fires Burner Stops Pr...

Страница 18: ...583 50 75 86 134 21 Q P N M L K J H G F E D C B A MODEL R S UC 596 865 601 766 134 207 390 841 817 840 845 74 115 167 205 310 666 2 2 Dimensions 2 2 1 U Series Utility UHE UPHE USHE Models 2 2 2 U Ser...

Страница 19: ...00 700 773 210 95 161 67 40 90 40 67 705 50 50 KP 413 900 700 773 210 95 161 67 40 90 40 67 705 50 50 KS 413 900 700 773 210 95 161 67 40 90 40 67 705 50 50 Q P N M L K J H G F E D C B A MODEL R S KC...

Страница 20: ...Page 18 2 3 Flue Options Components Dimensions 2 3 1 HE Low Level Balanced Flue Kit FBF Comprising the following four main components...

Отзывы: