Wardrobes Online Maxi Wall Hung Series Скачать руководство пользователя страница 4

12.

 

Once all panels and shelves/drawers are secured, measure along the top of the system from wall-to-wall to get 
your overall width measurement for the top shelf. Cut the top shelf to size using an 8pt saw. We recommend 
using masking tape along your cut line before you cut, to reveal a nice clean cut. Screw the top shelf into each 
vertical gable at the front and back. If you have limited space above the top shelf and cannot access with a screw 
driver, we recommend securing the top shelf from underneath using Econo brackets (supplied). 
 

 

13.

 

Screw hanging rail brackets to their opposing walls. Top rail should be installed as shown: 50mm down from the 
top and 300mm from the back wall is where the top of the bracket should be fixed.  
For mid height rails, we recommend installing them 1m below the top height rail. Slot hanging rails into 
brackets. Refer to Hanging Rail instructions for information about cutting rails to size. 

 

14.

 

Once everything is in place including the top shelf, secure the system to your gibbed walls with the Econo 
brackets supplied. Where possible, fix Econo bracket into studs. Use a 5mm drill bit. If your system has drawers it 
is recommended to secure Econo brackets under the shelf above the top drawer, this will be hidden at the very 
back and will help your system stay square for efficient drawer operation. 

 

 

 

 

300 

Содержание Maxi Wall Hung Series

Страница 1: ...ht at 1850mm from the floor Measure the width of the wardrobe at this height and cut the rail and white cover to size Using a spirit level mark out the holes ensuring you are installing the back bar i...

Страница 2: ...r 2 screws into holes These meet with the thread in the sleeves to securely fit the Suspension Bracket to the panel 6 Lay out your vertical panels and fit Cam Pins Refer to Diagram A for shelf positio...

Страница 3: ...9 Hook each vertical wall panel into the horizontal back bar in position allowing gaps for your hanging rails and shelves drawers Screw to tighten 10 Fit your melamine shelves into the pins Screw Cam...

Страница 4: ...to their opposing walls Top rail should be installed as shown 50mm down from the top and 300mm from the back wall is where the top of the bracket should be fixed For mid height rails we recommend ins...

Страница 5: ...Diagram A...

Страница 6: ...from the top insert cam pin for Shelf 5 S 15 S 24 S 32 S 40 S 49 S 5 S 15 S 24 S 32 S 40 S 49 S 5 S 15 S 24 S 32 S 40 S 49 S 5 S 15 S 24 S 32 S 40 S 49 S 5 S 15 S 24 S 32 S 40 S 49 S 5 S 5 S 5 S 5 S 5...

Страница 7: ...INSTALLATION INSTRUCTIONS DRAWER ASSEMBLY Baseboard Front Panel Back Panel Side Panels Front Face Cam Pins Cam Locks Screws Tools...

Страница 8: ...must face outwards 2 Screw cam pins into drawer back panel and drawer front panel 3 Attach both side panels to the drawer front panel Insert drawer base board 4 Line up and attach drawer back panel E...

Страница 9: ...face panel Use pencilled lines for accuracy The bottom of the drawer should be flush with the drawer front face Screw to secure 7 Turn drawer upside down Drawer runners come in pairs left and right E...

Страница 10: ...For Mid Height Rail Measure 300mm from the back of the tower wardrobe panel From that mark measure 1000mm down from the top height rail Note because floors are sometimes not level we recommend you che...

Отзывы: