containing chlorine shall be avoided as the chlorine may react with the refrigerant and corrode the

copper pipe-work. If a leak is suspected, all naked flames shall be removed/extinguished. If a leakage of

refrigerant is found which requires brazing, all of the refrigerant shall be recovered from the system, or

isolated (by means of shut off valves) in a part of the system remote from the leak. Oxygen free nitrogen

(OFN) shall then be purged through the system both before and during the brazing process.

7 REMOVAL AND EVACUATION

When breaking into the refrigerant circuit to make repairs – or for any other purpose – conventional

procedures shall be used.However, it is important that best practice is followed since flammability is a

consideration. The following procedure shall be adhered to: remove refrigerant; purge the circuit with

inert gas; evacuate; purge again with inert gas; open the circuit by cutting or brazing.The refrigerant

charge shall be recovered into the correct recovery cylinders. The system shall be “flushed” with OFN to

render the unit safe. This process may need to be repeated several times.Compressed air or oxygen shall

not be used for this task. Flushing shall be achieved by breaking the vacuum in the system with OFN and

continuing to fill until the working pressure is achieved, then venting to atmosphere, and finally pulling

down to a vacuum. This process shall be repeated until no refrigerant is within the system. When the

final OFN charge is used, the system shall be vented down to atmospheric pressure to enable work to

take place.This operation is absolutely vital if brazing operations on the pipework are to take place.

Ensure that the outlet for the vacuum pump is not close to any ignition sources and there is ventilation

available.

8 CHARGING PROCEDURES

In addition to conventional charging procedures,the following requirements shall be followed.

- Ensure that contamination of different refrigerants does not occur when using charging equipment.

Hoses or lines shall be as short as possible to minimise the amount of refrigerant contained in them.

- Cylinders shall be kept upright.

- Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.

- Label the system when charging is complete (if not already).

- Extreme care shall be taken not to overfill the refrigeration system.

Prior to recharging the system it shall be pressure tested with OFN. The system shall be leak

tested on completion of charging but prior to commissioning. A follow up leak test shall be

carried out prior to leaving the site.

9 DECOMMISSIONING

Before carrying out this procedure, it is essential that the technician is completely familiar with the

equipment and all its detail. It is recommended good practice that all refrigerants are recovered safely.

Prior to the task being carried out, an oil and refrigerant sample shall be taken in case analysis is required

prior to re-use of reclaimed refrigerant. It is essential that electrical power is available before the task is

commenced.

a) Become familiar with the equipment and its operation.

b) Isolate system electrically.

c) Before attempting the procedure ensure that :mechanical handling equipment is available, if required,

for handling refrigerant cylinders; all personal protective equipment is available and being used correctly;

the recovery process is supervised at all times by a competent person; recovery

equipment and

cylinders conform to the appropriate standards.

d) Pump down refrigerant system,if possible.

Содержание WAP1-08BC

Страница 1: ...hanks to every customer for choosing WANAI and trust in WANAI Our customer service is dedicated to solving every after sales problem for you If there are any questions about our products please feel f...

Страница 2: ...me of Parts 11 3 Accessories 12 4 Appearance and Function of Control Panel 13 5 Appearance and Function of Remote Control 13 6 Operation Introduction 14 7 Installation Explanations 16 8 Maintenance Ex...

Страница 3: ...tinuously operating ignition sources for example open flames an operating gas appliance or an operating electric heater Do not pierce or burn Be aware the refrigerants may not contain an odour Applian...

Страница 4: ...facturing company Maintenance and repairs that require the assistance of other qualified personnel must be performed under the supervision of an individual specified in the use of flammable refrigeran...

Страница 5: ...hroughout the EU To prevent possible harm to the environment or human health from uncontrolled waste disposal recycle it responsibly to promote the sustainable reuse of material resources To return yo...

Страница 6: ...itch disconnect the power supply and contact the dealer or a designated repair shop In any case the power cord shall be firmly grounded To avoid the possibility of danger if power cord is damaged plea...

Страница 7: ...t there are no flammable hazards or ignition risks No Smoking signs shall be displayed 1 7 Ventilated area Ensure that the area is in the open or that it is adequately ventilated before breaking into...

Страница 8: ...ot have to be isolated prior to working on them 3 REPAIR TO INTRINSICALLY SAFE COMPONENTS Do not apply any permanent inductive or capacitance loads to the circuit without ensuring that this will not e...

Страница 9: ...ce Ensure that the outlet for the vacuum pump is not close to any ignition sources and there is ventilation available 8 CHARGING PROCEDURES In addition to conventional charging procedures the followin...

Страница 10: ...lete with pressure relief valve and associated shut off valves in good working order Empty recovery cylinders are evacuated and if possible cooled before recovery occurs The recovery equipment shall b...

Страница 11: ...d off during repair procedures Information about the concept of sealed components and sealed enclosures according to IEC 60079 15 2010 Information about the correct working procedures a Commissioning...

Страница 12: ...h nitrogen for 5 min Evacuate again Fill with nitrogen up to atmospheric pressure Put a label on the equipment that the refrigerant is removed e Disposal Ensure sufficient ventilation at the working p...

Страница 13: ...torage of equipment should be in accordance with the manufacturer s instructions Storage of packed unsold equipment Storage package protection should be constructed such that mechanical damage to the...

Страница 14: ...1 Remote Controller 1 Window Kit 1 optional T slot screw translation 3 optional Water pipe 1 optional Batteries 2 optional After unpacking please check whether the above mentioned accessories are inc...

Страница 15: ...direct sunlight A Power on off 1 Fan mode B Operation mode 2 Dehumidifying mode C Temperature down 3 Cooling mode D Temperature up 4 Low fan speedWater full E Fan speed 5 Timer on off F Timer on off 6...

Страница 16: ...d AC110 120V 60Hz socket 5 Press the POWER button to turn on the air conditioner 1 Before using Notice Operation ambient temperature range Check up whether the exhaust hose has been mounted properly C...

Страница 17: ...ditioner ON press Timer button and select a desired OFF time through the temperature andtimesetting buttons PresetOFF Time isdisplayedontheoperationpanel OFFtimecanberegulatedatanytimein1 24hours 6 Wa...

Страница 18: ...ator lights up please connect a drain hose to the bottom drainage hole then all the water in the water tank will be drained outside The unit can also work well 7 Installation Explanations 1 Installati...

Страница 19: ...and Fig 5a check the min and max size of the window before the installation 1 Install the window kit on the window Fig 5 Fig 5a 2 Adjust the length of the window slider kit according to the window wid...

Страница 20: ...ls water level When water level reaches an anticipated height the water full indicator lamp lights up If water splash motor is damaged when the water is full please remove the rubber blockage at the b...

Страница 21: ...kewarm 104 and dry it up in the shade Mounting Putting the air filter into the inlet grille replace the components as they were 2 Clean the Air conditioner Surface First clean the surface with a neutr...

Страница 22: ...out replacement 5 E1 Code Condenser temperature sensor failed Replace condenser temperature sensor 6 E2 Code Water tray full when cooling Take off rubber stopper and empty the water 7 E3 Code Evaporat...

Отзывы: