20
Pic. 1
1. Usage
1.1 Structure of the equipment
1. furnace chamber door
2. smoke tube end 150mm
3. primary air regulator
4. sekundär air regulator
5. door knob
6. ash bin > model plate on back side
of ash bin
7. assembly the fire plate of
TYP18815 Rocky
primary air
air inside
sekundär
air
5
3
3
1
4
4
5
2
2
6
6
1
7