background image

Contents

01GRA0301-V2

Please retain product label (Attached to your building) for reference with all future contact

Length - 580mm

Width - 991mm

Height - 2014mm 

Before 

commencing assembly  

make sure you have a 

suitable base ready to 

erect your building 

 

Fixing Kit

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(not supplied) including  a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are delivered pre-treated with a water based timber treatment 

however this only helps to protect during transit of your garden item. To 

validate your guarantee and for better protection against weathering it is 

ESSENTIAL that you treat the garden building with a wood preserver within 3 

months of assembly. This will need to be re-applied annually to ensure longevity 

of your building. Care must be taken when constructing the garden building 

that it is not touching the ground and is on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and 

annual treatment.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  The base should be slightly 

smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a run off for water. It is also recommended 

that the floor be at least 25mm above the surrounding ground level to avoid flooding.

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

This building should be erected by 

two people.

For ease of assembly, you must pilot 

drill all screw holes and ensure all 

screw heads are countersunk.

Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we 
cannot accept responsibility for your safety whilst erecting or using this product.

Retain Instructions for future reference

1

2

3

5

6

8

9

Door Gable

7

10

4

Plain Gable

Plain Side x2

Door

Floor

Roof - 610x580mm

x2

Cover Trim - 1727mm x4

Fascias - 610mm x4

Roof Eaves - 580mm x2

Diamond finial 

x2

Nail Bag & Ironmongery

Felt

T-Hinge x3

Felt Tacks x30

30mm Screw x64

50mm Screw x24

40mm Screw x10 

11

12

13

Pad Bolt

Отзывы: