background image

Assembly

 

Step 1

Remove 

transportation blocks

 

from the bottom of each panel 
before beginning assembly. Each 
Panel should have two blocks.

Step 2

Place the floor on a firm and level base, 
ensure base has suitable drainage  free 
from areas where standing water can 
collect.  (See front page on base 
requirements).  

4

Fix the hinge to the door 

using 30mm screws ensuring 

that the screws go through 

to the door framing.

Step 3

21x 30mm Screws

30mm 

screw

1

3

13

13

Step 4

 

Fix the corners with 2x 50mm  

 

screw as shown in diagram.

 

Do not secure the building to the  

 

floor until the roof is fitted. Fix  

 

the panels onto the floor using  

 

50mm screws in alignment with  

 

the floor joists

11x 50mm screws

50mm 

screw

2

5

Step 5

Fix door gable and Plain side 

using same method shown in 

step 5.

Position the panels so there is 

equal spacing between the floor 

and cladding on all four sides.

17x 50mm screws

50mm 

screw

1

5

Отзывы: