Step 6
Fix
Eave framing
to edge of
Roof
sheet
using 4x30mm screws.
Place roof into position ensuring
the eave frame fits butt against
the panel cladding. Fix using
10x30mm screws as shown in
diagram.
14 x 30mm screws
*
Fix eave frame to
roof sheet first
Step 7
Lay sheet of felt onto roof as
shown in diagram ensuring
there is a 50mm overhang
around the sides.
Fix using felt tacks at 100mm
intervals
80 x Felt Tacks
100mm
intervals
50mm
Overhang
1mm
30mm
screws
44 x 30mm screws
Fix
hinges
to the
doors
with
30mm screws ensuring the
screws are located into the door
framing.
Position each door on to the
building leaving a 2mm gap in
between doors and building. Fix
the door to the building with
30mm screws.
Fix
pad bolt
with 6x30mm screws
to horizontal door brace.
Then fix the pad bolt retainer to
the opposite door framing using
4x30mm screws.
Step 8
*Fix door block and turn key to top
and bottom of door with bolt
retainer fitted, using 30mm screws.
Step 9
Use 3x30mm screws to fix
each
cover trim
.
12 x 30mm screws
9 x 40mm screws
Step 10
Fit
fascia boards
to building
using 3x40mm screws per
board as shown in diagram.
Pre drill holes before hand,
making sure screws go into
the framing.