Assembly
Step 1
Remove transportation blocks
from the bottom of each panel
before beginning assembly.
Each Panel should have two
blocks.
Step 2
Place floor on a firm and
level base, ensure base has
suitable drainage free from
areas where standing water
can collect. (see front page
on base requirements).
Step 3
Do not secure the building
to the floor until the roof is
fitted. Fix the panels onto
the floor using 50mm
screws in alignment with
the floor joists
Fix the corners with 3x
50mm screw a shown in
diagram.
Position the panels so there is
equal spacing between the
floor and cladding on all 4 sides
9 x 50mm screws
Step 4
Fix
door gable
and
front panel
using same method shown in
step 3.
15 x 50mm screws
Step 5
Place the
Gable Top
onto the
plain gable, ensuring the
cladding and framing on either
side is flush with gable. Fix with
2x30mm screws as shown in
diagram.
4 x 30mm screws
*Shiplap Only
*Shiplap Only