background image

Assembly 

Step 1

Remove transportation blocks 

from the bottom of each panel 

before beginning assembly. 

Each Panel should have two 

blocks.

Step 2

Place floor on a firm and 

level base, ensure base has 

suitable drainage  free from 

areas where standing water 

can collect.  (see front page 

on base requirements). 

Step 3

Do not secure the building 

to the floor until the roof is 

fitted. Fix the panels onto 

the floor using 50mm 

screws in alignment with 

the floor joists

Fix the corners with 3x 

50mm screw a shown in 

diagram.

Position the panels so there is 

equal spacing between the 

floor and cladding on all 4 sides

9 x 50mm screws

Step 4

Fix 

door gable

 and 

front panel 

using same method shown in 

step 3.

15 x 50mm screws

Step 5

Place the 

Gable Top

 onto the 

plain gable, ensuring the 

cladding and framing on either 

side is flush with gable. Fix with 

2x30mm screws as shown in 

diagram.

4 x 30mm screws

*Shiplap Only

*Shiplap Only

Отзывы: