Step 3
Place the left gable onto the floor
and secure at the corner with
3x50mm screws.
Fix to the floor using 2x50mm screws,
ensure to screw through the framing
into the floor bearers.
5x50mm Screws
Pre drill
hole
50mm
screw
a
b
Step 3
Fix the front panel inbetween the gables,
securing into place with 4x50mm screws
from the inside of the building.
*Ensure to align the framing with the edge
of each gable.
4x50mm Screws
Pre drill
hole
50mm
screw
8
8
Step 4
Attach the door strips to either side of the
building.
*Ensure the strip sits fush to edge of the
framing and there is NO overhang inside
the building.
6x30mm Screws
11
Step 5
Fit 2x butt hinges to each door with
3x30mm screws per hinge.
Align each door into the door gap
and secure into place with 3x30mm
screws per hinge.
*Ensure the doors open and close
freely without any obstructions.
24x30mm Screws
P 3
Please retain product label and instructions for future reference