 4  

 

 

General 

This operating instruction includes any and all rules for operation, placing into operation and 
maintenance of the air blower. 

All details and notes in this operating instruction were prepared subject to the applicable 
regulations, the latest engineering stage of development as well as according to our long-term 
knowledge and experience. 

The translations of the operating instruction were carried out according to the best of 
knowledge.  
However, we exclude any liability for translation errors.  
The enclosed German version of this operating instruction shall be decisive. 

The actual scope of delivery may vary from the descriptions and drawings as provided here 
when it comes to special design, additional order options or due to latest technical changes.  
Please contact us for any questions. 

This operating instruction must be read carefully prior to any work on or with the 
device, in particular before any placing into operation!  
The manufacturer shall not assume any liability regarding defect and malfunction 
resulting from any non-observation of this operating instruction.  

The operating instruction must be kept absolutely close to the device and must be accessible 
for all persons working on or with the device  
It is not permitted to provide this operating instruction to any third party, any provision may result 
in damage claims 

– if applicable. We reserve the right to further claims.  

Prior to placing the device into operation it must be checked for being free of defects and for 
working technically correct. 

The original version is in the German language. 

We reserve our right to technical changes on the product within the framework of improvement 
of the functional characteristics and further development. 

This operating instruction is our property.  
Any copying, use or notification to third parties is criminal and liable to prosecution (German 
Copyright Act against Unfair Competition, German Commercial Code).  
All rights reserved for the case of patent right issue (section 7, subsection 1 German Patent 
Law) or GM registration (section 5, subsection 4 GMG). 

 

Содержание 95001

Страница 1: ...1 Operating Instruction English Revision A Date 23 11 2012 author NH This operating instruction is not subject to updating Air Blower 95001...

Страница 2: ...nd reliability of our air blower for many years we recommend regular inspection and maintenance Our customer service provides optimal support which we offer within the framework our service and mainte...

Страница 3: ...GENERAL 4 3 WARRANTY 5 4 SAFETY INSTRUCTIONS 6 5 PRODUCT DESCRIPTION 8 5 1 INTENDED USE 8 5 2 TECHNICAL DESCRIPTION 8 5 3 TECHNICAL DATA 8 6 INSTALLATION MANUAL 9 7 OPERATING INSTRUCTION 10 8 MAINTEN...

Страница 4: ...ore any placing into operation The manufacturer shall not assume any liability regarding defect and malfunction resulting from any non observation of this operating instruction The operating instructi...

Страница 5: ...chasing agreement and in the General Terms and Conditions of Deliveries and Services of C K Walther GmbH Co KG in the version as applicable on the date of execution of the purchasing agreement General...

Страница 6: ...ult clearance and long term non use as well as maintenance works disconnect the air blower from the pressure source Air blowers must not be diverted from its intended use or rebuilt Only use original...

Страница 7: ...shing mounting and installation works of the air blower and prior to the placing it into operation the following points must be observed Check again all screw connections for tight fit Prior to placin...

Страница 8: ...sion The nozzles are designed in such way to provide a wide protection against improper use so that any excessive buildup of pressure is avoided when placed on skin Nevertheless the blowing force is u...

Страница 9: ...general accident prevention regulation in such way that proper operation according to the operating instruction is possible any outer damage of the unit as well as of the moving parts is excluded Aft...

Страница 10: ...o avoid any possibly life endangering injuries of the personnel and damage to the air blower during operation only the conditions of use as indicated under the point product description must be used T...

Страница 11: ...following points A visual inspection regarding possible damage and soiling must be carried out Soiling of the functional area seal area actuating elements accessible from outside can be removed by si...

Страница 12: ...ter quench Notes and Remarks The holding time per test is 10 sec Taking into account a leak rate of 10 2 mbar x l s 3 gas bubbles with a diameter of 4 mm may escape in these 10 sec After the testing t...

Страница 13: ...he storing conditions of the air blower must be subject to the guidelines regarding the seals because the seals may alter by improper storage The following points must be observed The air blower must...

Страница 14: ...11 Placing out of Operation At the end of the service life the air blower or its single parts must be disposed of in an environmentally sound manner and according to the legal requirements For this p...

Страница 15: ...2 G General 4 H Hazard Notes 6 I Intended Use 8 M manual pick up 10 Max working pressure 8 N Noise level 8 O Operating temperature 8 P particular 6 Placing 14 S Safety instructions 6 Service 2 Storag...

Отзывы: