Revision 3
8
Product Manual ALB-01, 03 & 05
1. Ensure product fixings are correctly fitted as detailed in the following
instructions.
2. Ensure all fixings are tightened to the recommended torque as detailed in the
following instructions.
3. Seal the edges of the product to the wall and floor. Fill gaps between the bath
panels, the bath and the bath tap using anti-pick hard set mastic, examples of
recommended types are:
a. Arbokol 1025, manufactured by Adshead Ratcliffe & Co Ltd
(
www.arbo.co.uk
).
b. Sikadur 33 manufactured by SIKA Ltd (
www.sika.co.uk
)
5.2.1.
Installation Guidelines
▪
The bath must be attached to a frame (see Fig. 1) mounted on a level floor
suitable for supporting the bath tub, water and occupant. See Table 1 for
the weight. Refer to Figures 2 and 3 for a typical installation of the bath.
▪
Hot and cold-water supplies are necessary. See Table 1 for the
specifications of the water supplies.
Figure 1. Wallgate bath support frame
•
Using the appropriate Bath Installation site orientation instruction sheet:
ALB-01, ALB-03 or ALB-05.
o
Determine the position of the optional electronic control unit (see
Figure 4), position of services, cut any appropriate holes for water,
waste and wiring.
Содержание ALB-01
Страница 1: ...Product Manual ALB 01 03 05 Solid Surface Bath Tap Electronic Control ...
Страница 2: ...Revision 3 2 Product Manual ALB 01 03 05 AS 3498 Certificate No 23167 ...
Страница 10: ...Revision 3 10 Product Manual ALB 01 03 05 Figure 2 Typical Bath Installation sht 1 ...
Страница 11: ...Revision 3 11 Product Manual ALB 01 03 05 Figure 3 Typical Bath Installation sht 2 ...
Страница 14: ...Revision 3 14 Product Manual ALB 01 03 05 Figure 4 Solenoid Control unit installation connection ...
Страница 19: ...Revision 3 19 Product Manual ALB 01 03 05 Notes PAGE INTENTIONALLY LEFT BLANK ...