Revision 3
12
Product Manual ALB-01, 03 & 05
5.3.
Connecting Services to the Bath
Follow the instructions to connect services to the bath:
NOTE: Flush the water supply pipes to remove any debris and trapped air.
NOTE: Fit a Y strainer or similar in the feed pipes before connection to the
solenoids, especially on installations where loose particles from older pipe
work can cause a blockage in the valves & taps.
NOTE: Fit a service isolating tap on the feed to each solenoid. This allows easy
maintenance when required. The isolating tap is not supplied by Wallgate.
NOTE: Pipe sealing compound should be avoided. If it is used, it should be
used sparingly. To prevent blockages and damage to the bath tap aerators and
water solenoid valves.
1.
Tap Head:
On the pre-installed bath mounted tap head, fit the two push fit
22mm x ¾” BSP straight push fit connectors onto the protruding ¾” BSP water
inlets. Then tighten nuts to 4Nm.
2.
Bath waste:
a. Fit the supplied seal washer under the chrome rim of bath waste. Insert
the bath waste spigot through the bath outlet hole from the top inside of
bath.
NOTE: If required to ensure a water tight bath waste fitting use a suitable
sealant.
b. Install the 2
nd
seal washer onto the protruding bath waste spigot.
Orientate and fit the overflow housing open face against 2
nd
seal
washer. Fit nut onto spigot and tighten. Push the top end of overflow
pipe onto protruding pre-fitted bath overflow spigot.
3.
Solenoid Valve:
a. On the valve, note direction of water flow and keeping the solenoid
valves in a horizontal & coil upright orientation, with 22mm x
¾” push fit
connectors fitted and tightened to 4 Nm. Push fit 22mm hot and cold
pipes from solenoid to tap head.
Содержание ALB-01
Страница 1: ...Product Manual ALB 01 03 05 Solid Surface Bath Tap Electronic Control ...
Страница 2: ...Revision 3 2 Product Manual ALB 01 03 05 AS 3498 Certificate No 23167 ...
Страница 10: ...Revision 3 10 Product Manual ALB 01 03 05 Figure 2 Typical Bath Installation sht 1 ...
Страница 11: ...Revision 3 11 Product Manual ALB 01 03 05 Figure 3 Typical Bath Installation sht 2 ...
Страница 14: ...Revision 3 14 Product Manual ALB 01 03 05 Figure 4 Solenoid Control unit installation connection ...
Страница 19: ...Revision 3 19 Product Manual ALB 01 03 05 Notes PAGE INTENTIONALLY LEFT BLANK ...