INSTALLATION MANUAL

100232-f  05/2020

Содержание Pro

Страница 1: ...Driving eMobility wallbe Charging station Pro Wallbox charging column INSTALLATION MANUAL 100232 f 05 2020...

Страница 2: ...Mounting of the charging column 5 3 3 1 Use of the prefabricated foundation 5 3 3 2 Casting of an own foundation with foundation plate 5 3 3 3 Casting of an own foundation without foundation plate 6...

Страница 3: ...nly be carried out by qualified construction workers 2 SAFETY 2 1 Signal words WARNING Indicates a hazard with a medium level of risk which if not avoided could result in serious in jury or death CAUT...

Страница 4: ...nly be installed and ope rated with the supplied cover mounting plate and cable holder No liability will be accepted for damage during trans port if the product is transported in anything other than t...

Страница 5: ...e Pro On the bottom of the housing you will find 8 mm holes in the four corners for fastening the full metal housing 7 Fasten the full metal housing with all four screws and washers 3 3 Mounting of th...

Страница 6: ...tion plate proceed as follows 1 For the foundation dig a excavation pit with a mini mum area of 100 x 80 cm and a minimum depth of 60 cm 2 Make a firm gravel bed 3 Fix the foundation plate in the desi...

Страница 7: ...y cable cable cross sections and fuse protection Performance class 3 7 kW 16 A 4 6 kW 20 A 7 4 kW 16 A Conductor Number Color L 1 brown or black brown or black brown or black N 2 blue blue blue PE 3 g...

Страница 8: ...through the legs of the char ging column 2 Place the charging station on the foundation and align the charging station 3 Use the charging station base as a drilling template and fasten the charging s...

Страница 9: ...contactor monitoring Lock release module RCD must be installed in the sub distribution Type A 0 03 A 25 A Circuit breaker Not integrated Authorization RFID app Housing lockable Optional Energy meter Y...

Страница 10: ...Lock release module RCD must be installed in the sub distribution Type A 0 03 A 40 A Circuit breaker Not integrated Authorization RFID app Housing lockable Optional Energy meter Yes Protocols Modbus T...

Страница 11: ...ntactor monitoring Lock release module RCD must be installed in the sub distribution Type A 0 03 A 25 A Circuit breaker Not integrated Authorization Key switch RFID Housing lockable Optional Energy me...

Страница 12: ...Lock release module RCD must be installed in the sub distribution Type A 0 03 A 25 A Circuit breaker Not integrated Authorization Key switch RFID Housing lockable Optional Energy meter Yes Protocols...

Страница 13: ...Lock release module RCD must be installed in the sub distribution Type A 0 03 A 40 A Circuit breaker Not integrated Authorization Key switch RFID Housing lockable Optional Energy meter Yes Protocols M...

Страница 14: ...ock release module RCD must be installed in the sub distribution Type A 0 03 A 25 A Circuit breaker Not integrated Authorization Key switch RFID Housing lockable Optional Energy meter Yes Protocols Mo...

Страница 15: ...ock release module RCD must be installed in the sub distribution Type A 0 03 A 40 A Circuit breaker Not integrated Authorization Key switch RFID Housing lockable Optional Energy meter Yes Protocols Mo...

Страница 16: ...ts reserved This document may not be copied in whole or in part or reproduced in any form or form without the written permission of wallbe GmbH All illustrations in this manual are only examples and m...