background image

K001

14 

- 74 -

ø 2 mm (

3

/

32

’’)

100 mm (3 

15

/

16

’’)

65 mm (2 

9

/

16

’’)

17,5 mm

 (

11

/

16

’’)

4,5 mm (

11

/

64

’’)

47 mm (1 

27

/

32

’’)

56,1 mm (2 

13

/

64

’’)

10

12

17,5 mm

 (

11

/

16

’’)

69 mm (2 

23

/

32

’’)

104 mm (4 

3

/

32

’’)

en

Installation

Control panel installation

Cut a suitable installation hole for the control panel in the selected location. Try to 
install the panel in a vertical surface in a location that will remain dry.  

Measurements of the control panel installation cut-out.

If necessary, predrill holes for the ø 2 mm ( 

3

/

32

”) screws.

You can utilize the sample of the box when drawing the lines of the 
installation hole.

Connect the control panel cable from the device to the control panel (10).
Use the fastening screws to install the control panel to the installation cut-out (12).

The thermostat sensor is in the panel face, so select the location 
with thermostatic operation/regulation in mind.  Do not install close 
to heat source or close to a window or door.  Avoid locations that 
might be contacted by direct sunlight.  The length of the control 
panel cable is 6 m.

1800 t / 2400 t

490535

en

Содержание 1800 t

Страница 1: ...er fuel hose and control panel cable installed Accessory bag 17662B Mounting plate 1 pcs 1 pcs 1 pcs 1 pcs 2 pcs Push on contact 6 3 x 0 8 yellow Fuse 15 A blue Fastening screw 4 8 x 16 mm DIN 7981 IS...

Страница 2: ...tted length of exhaust pipe Maximum permitted length of fuel hose Minimum area of the replacement air opening Suitable Exhaust gas lead throughs Technical information 2467 and 2460 Heating power min M...

Страница 3: ...by thermostat The heated air is circulated through the cabin through the warm air ducting In hot and or humid conditions these heating units can be used for simple fresh air ventilation and circulatio...

Страница 4: ...be installed vertically level when the boat is on an even keel The static inclination must not exceed 5 While the device will tolerate being temporarily tilted to a steep angle even for some hours th...

Страница 5: ...quipment In a metal hulled boat you must ensure that the device the exhaust gas lead through the fuel connection the control panel and all other parts are insulated from the boat s hull This must be d...

Страница 6: ...r is in horizontal position Lift the heater into the installation plate and lock the device with the mounting bolts 2 There has to be a corrugated base plate 3 under the head of the screw Be sure that...

Страница 7: ...d on deck with bolts 42 M5 x 85 and nuts 43 with lock washer 44 under Tight the nuts but not so hard the base plate deforms Place the spacing tube 41 and mounting plate 1 on bolts 42 and fasten with n...

Страница 8: ...cut out If necessary predrill holes for the 2 mm 3 32 screws You can utilize the sample of the box when drawing the lines of the installation hole Connect the control panel cable from the device to th...

Страница 9: ...a loop to the control panel cabel must be done A cable tie must be attached to cable in order to avoid the cable detach from the connec tor Connections of the device Things to note about the connecti...

Страница 10: ...the power cord m Cross sectional area of the cable in square mm US Gauge If a thicker cable is required make a separate joint in the power cord See picture on the next page Main switch A main switch a...

Страница 11: ...nerate the large amount of current the glow plug requires After the 12V battery the connec tion is the same as in a 12 V system 24V direct current system Jointing A jointing should only be made in lon...

Страница 12: ...etal filters are available as accessories Fuel feed If the lift height exceeds 2 m the fuel feed must be checked and if necessary ad justed The fuel feed must also always be checked if parts of the fu...

Страница 13: ...are thereafter cut to suitable length the suction tube straight off The suction filter 16 is mounted at the suction tube end with nut 18 rubber ring 19 and plastic shield washer 20 Excess fuel return...

Страница 14: ...llation cut out with silicone in addition to the lead through seal Note Do not use silicone on a wooden boat The side lead through must always be equipped with a so called goose neck sec tion The goos...

Страница 15: ...between the metal hull and the device This can result in the oxidation or malfunctioning of the device s circuit board and in the worst case scenario the circuit board may be damaged Insulation kit 2...

Страница 16: ...uitable sealing agent on both sides of the seal and on the screw holes This will ensure that the connection is waterproof Side lead through 2467 installed The installation cut out is 50 mm 1 31 32 and...

Страница 17: ...en assembling the lead through ensure that the order of the parts is correct Also make sure that the spring goes in the cor rect hole in the cap Otherwise the lead through cannot be closed Maintenance...

Страница 18: ...tion cut out is 50 mm 1 31 32 and the screw holes are 4 x 6 mm Closable deck lead through 2460 and lead through elevation 2069 for particularly demand ing conditions Length difference of the pipes The...

Страница 19: ...allation To ensure a proper air flow in a long duct into a far front of the boat it is useful to to lead the hotter duct all the way to the front The other duct can then be distributed according the n...

Страница 20: ...eated space will be removed Too much resistance in the ductwork too many flaps closed and the heater may overheat and shut down If the heater will be used mainly with thermostat control the control pa...

Страница 21: ...eater must be open at all times Installation of the air registers When installing the warm air register 2411 remove the grill part 1 of the body 7 by pulling The grill part can be turned 360 to be abl...

Страница 22: ...hat the boat is sufficiently ventilated The exhaust pipe outlet must be at least 400 mm away from the opening for filling fuel or tank breather We recommend installing the operating switch onto vertic...

Страница 23: ...een ig nited and the combustion has stabilised after about five minutes after the ignition The whole process takes about five minutes First ignition After the installation or maintenance the heater ma...

Страница 24: ...ce automatically if the temperature rises above the requested temperature for example due to sunlight The temperature must rise by 3 C above the set value for a half an hour If the device has been shu...

Страница 25: ...ontinuously at least 2 seconds while heating is on the heater will shut off and after the aftercooling mode the heater goes to ventilation mode Ventilation is 2 positions Min Max The thermostat contro...

Страница 26: ...lly Aftercooling Orange Sun switch has shut down the device Orange Device in remote control mode Orange Yellow Heating on Signal lights Air boost Green Yellow Thermostat control the set temperature is...

Страница 27: ...binds the water in the fuel and prevents the fuel from settling and spoiling during the summer sea son For the dosage observe the recommendations provided by the manufacturer of the agent Winter stor...

Страница 28: ...that none of the cords or the fuel line will not remain between the bottom plate and the frame Check that the sleeve of return line fits to the return line located in the burner bottom Tighten the nu...

Страница 29: ...on of the device or for any damage in transit of a device that has been sent for repair Warranty does not include any transport costs Wallas is a return to base warranty d The customer must provide th...

Отзывы: