
I like how they routed the linkage though, straight back.
The motor has been replaced with a gearbox. Hopefully, those are metal gears! A weak
spot here is that flexible plastic pitch link to the blade holders. They'll wear out in time.
Do NOT bid this thing over $85 on eBay, not worth it!
Df4 chassis Prep:
First, start by removing the main rotor head. It is absolutely necessary anyway.
1) Poke out the “Jesus Pin”. 2) Disconnect the two upper swashplate links and just pull
the head straight up!
Содержание Dragonfly 35
Страница 4: ...3 RTV silicone sealant VERY important 3...
Страница 72: ...The flybar stabilizer yoke must not bind like this...
Страница 73: ...Take it apart and file sand all the high spots that bind Free up all movement on the 2 bearings...
Страница 75: ...Lock it s position with Loctite Sight them at 0 to each other and center seesaw add some...
Страница 86: ...Pull the Jesus Pin 035 If you ever lose it a paper clip works fine...
Страница 87: ...Unclip the lower ball links of your onion rings Pull the entire head straight up...