background image

852-112/000-001

Properties

Product manual | Version: 1.0.0

17

Industrial Eco Switch

Table 4: Legend for Figure "Power Supply (PWR) Port"

Connection

Custom Name

Description

+

PWR

Primary DC input

PWR

Primary DC input

!

 NOTICE

Damage to Property Caused by Electrostatic Discharge (ESD)!

DC Powered Switch: Power is supplied through an external DC power source. Since the
switch does not include a power switch, plugging its power adapter into a power outlet will
immediately power it on.

4.3.3 Network Connections

The industrial switch uses ports with copper connectors that can be used with ETHER-
NET and/or Fast ETHERNET protocols.

Figure 6: Network Connections

Table 5: Legend for Figure "Network Connections"

No.

Description

Details see Section:

1

Connection 8 x RJ-45 (10/100BASE-TX-Ports)

8

 

10/100BASE-TX ports [

}

 17]

4.3.3.1 10/100BASE-TX ports

The 10/100BASE-TX ports support network speeds of 10 Mbit/s and 100 Mbit/s and can
be operated in half and full-duplex transmission modes. These ports also provide auto-
matic crossover detection (Auto-MDI/MDI-X), with plug&play capabilities. Simply plug the
network cables into the ports; they then adapt to the end node devices.

We recommend the following cable for the RJ-45 ports:
• Cat 5e or better with a max. cable length 100 m.

Содержание 852-112/000-001

Страница 1: ...Product manual Version 1 0 0 WAGO Industrial Switches Industrial Eco Switch 8 Ports 100BASE TX 852 112 000 001...

Страница 2: ...e has been taken to ensure the accuracy and completeness of this documentation However as errors can never be fully excluded we always appreci ate any information or suggestions for improving the docu...

Страница 3: ...Autonegotiation 12 3 4 Autocrossing 12 3 5 Functioning of Switches 13 3 6 Store and forward switching mode 13 3 7 Line Depth in PROFINET 13 3 8 Port Speed Duplex Mode 13 4 Properties 14 4 1 Views 14...

Страница 4: ...Site 21 6 Transport and Storage 22 7 Installation and Removal 23 7 1 Installation 23 7 1 1 Installation on a Carrier Rail 23 7 2 Removal 23 7 2 1 Removal from Carrier Rail 23 8 Connection 24 8 1 Groun...

Страница 5: ...e priority Obligations of Installers Operators The installers and operators bear responsibility for the safety of an installation or a sys tem assembled with the products The installer operator is res...

Страница 6: ...eys Cross References Links Cross references links to a topic in a document Cross references links to a separate document Cross references links to a website Cross references links to an email address...

Страница 7: ...is document as well as the use and communication of its content are strictly prohibited un less expressly authorized by prior agreement Third party products are always mentioned without any reference...

Страница 8: ...aims for change or improvement of products that have already been delivered excepting change or improvement performed under guarantee agreement are excluded Licenses The products may contain open sour...

Страница 9: ...rmed by qualified employees with sufficient knowledge in the administration of the PC system used in addition to file creation or modification Steps that change the PC system s behavior within a netwo...

Страница 10: ...the appropriate key or tool Only use devices equipped with ETHERNET or RJ 45 connectors in LANs Never con nect these devices with telecommunication networks Components Replace defective or damaged de...

Страница 11: ...having seeping and insulating properties such as aerosols silicones and triglycerides found in some hand creams If these substances occur in the environment of the products install the products in an...

Страница 12: ...e of 12 48 VDC Character istics such as auto negotiation and auto MDI MDIX crossover on all 10 100BASE TX ports are also realized 3 2 Switching Technology Industrial ETHERNET primarily uses switching...

Страница 13: ...switching mode In Store and Forward mode the ETHERNET switch caches the entire data telegram checks it for errors CRC checksum and if there are no errors puts it in a queue Subse quently the data tele...

Страница 14: ...Eco Switch Table 1 Legend for Figure Front View of the Industrial Eco Switch Custom Name Explanation For details see Section 1 PWR Status LED Power Supply 8 Display Elements 18 2 Status LED TX Port 10...

Страница 15: ...Legend for Figure Top View of the Industrial Eco Switch Custom Name Explanation For details see Section 1 Grounding screw 8 Grounding screw 16 2 Terminal block male connector for power supply PWR 8 P...

Страница 16: ...1 4 3 Connections 4 3 1 Grounding screw The switch must be grounded Connect the grounding screw to the ground potential Do not operate the switch without an appropriately installed protective earth co...

Страница 17: ...ports with copper connectors that can be used with ETHER NET and or Fast ETHERNET protocols Figure 6 Network Connections Table 5 Legend for Figure Network Connections No Description Details see Sectio...

Страница 18: ...it LEDs LED Name Status Description PWR Primary Power LED Green Using the primary power supply Off The primary power supply is off or has an error 4 4 2 Port LEDs Figure 8 Port LEDs Table 7 Legend for...

Страница 19: ...8 x 10 100BASE TX Standards IEEE 802 3 10BASE T IEEE 802 3u 100BASE TX IEEE 802 3x Flow Control PROFINET Conformance Class A CC A Topology Star Tree Line 4 5 4 Environment requirements Table 11 Techn...

Страница 20: ...installation startup maintenance and repair please observe the accident preven tion regulations of your machine e g DGUV Regulation Electrical Installations and Equipment Emergency stop functions and...

Страница 21: ...install the may greatly affect its performance When selecting a site we recommend considering the following rules Install the at an appropriate place See Section Environment requirements for the ac ce...

Страница 22: ...ection during transport and storage Store the product in suitable packaging preferably the original packaging Only transport the product in suitable containers packaging Make sure the product contacts...

Страница 23: ...hing it 7 1 1 Installation on a Carrier Rail The carrier rail must optimally support the EMC measures integrated into the system and the shielding of the internal data bus connections Place the onto t...

Страница 24: ...r the switch prevents electromagnetic interference from electromagnetic ra diation Observe the corresponding standards for EMC compatible installations as well 2 Plug the female connector into the mal...

Страница 25: ...nual Version 1 0 0 25 Industrial Eco Switch 9 Diagnostics Note For diagnostics and troubleshooting see sections Diagnostics via LED Indicators Diagnostics using product LEDs 8 Unit LEDs 18 Diagnostics...

Страница 26: ...equipment sent to a local collection point The guidelines 2006 66 EG PPWD 2018 852 EU and WEEE 2012 19 EU apply throughout Europe National directives and laws may vary Table 12 WEEE Mark Logo Descript...

Страница 27: ...elow Table 13 RJ 45 Cable Contact Description Pair Color 4 wire 8 wire 1 TD D1 2 White Orange 2 TD D1 2 Orange 3 RX D2 3 White Green 4 Not assigned D3 1 Blue 5 Not assigned D3 1 White Blue 6 RX D2 3 G...

Страница 28: ...15 Table 3 Legend for Figure Label 16 Table 4 Legend for Figure Power Supply PWR Port 17 Table 5 Legend for Figure Network Connections 17 Table 6 Legend for Figure Unit LEDs 18 Table 7 Legend for Fig...

Страница 29: ...1 Front View of the Industrial Eco Switch 14 Figure 2 Top View of the Industrial Eco Switch 15 Figure 3 Label 16 Figure 4 Grounding screw 16 Figure 5 Power Supply PWR Port 16 Figure 6 Network Connect...

Страница 30: ...s catalogs videos and other WAGO media are subject to copyright Distribution or modification of the contents of these pages and videos is prohibited Furthermore the content may neither be copied nor m...

Отзывы: