21
PEM-X1
OPERATING MANUAL
VERSION 03/2014
ORDER NUMBER DOC 2326020
6
ASSEMBLY AND COMMISSIONING
6.1
TRAINING ASSEMBLY/COMMISSIONING STAFF
Incorrect installation/operation!
Risk of injury and damage to the device.
The commissioning staff must have the technical skills to safely
undertake commissioning.
The commissioning staff must be familiar with the provisions of
European standard DIN EN 50050-2.
When commissioning and for all work, read and follow the
operating manual and safety regulations for the additionally
required system components.
WARNING
6.2
STORAGE CONDITIONS
Until the point of assembly, the powder spray gun must be stored in a dry location, free
from vibrations and with a minimum of dust. The powder spray gun must be stored in
closed rooms.
The air temperature at the storage location must be between 5 - 45 °C; 41 - 113 °F.
The relative air humidity at the storage location must not exceed 75%.
6.3
INSTALLATION CONDITIONS
The air temperature at the assembly site must be between 5 - 45 °C; 41 - 113 °F.
Depending on the powder lacquer used, the maximum permissible ambient temperature
for reliable operation can be signifi cantly below +40 °C; 104 °F.
The relative air humidity at the assembly location must not exceed 75%.
Содержание PEM-X1
Страница 2: ......
Страница 66: ...66 PEM X1 OPERATING MANUAL VERSION 03 2014 ORDER NUMBER DOC 2326020 14 4 EC TYPE EXAMINATION CERTIFICATE...
Страница 68: ...68 PEM X1 OPERATING MANUAL VERSION 03 2014 ORDER NUMBER DOC 2326020...
Страница 69: ...69 PEM X1 OPERATING MANUAL VERSION 03 2014 ORDER NUMBER DOC 2326020...
Страница 70: ...70 PEM X1 OPERATING MANUAL VERSION 03 2014 ORDER NUMBER DOC 2326020...
Страница 71: ......