background image

5

 

HERO 23D / Hero 23 / SF 23 Pro

GB

1.9 

MAX. OPERATING PRESSURE

The permissible operating pressure for the spray gun, spray 

gun accessories, unit accessories and high-pressure hose 

must not fall short of the maximum operating pressure of 25 

MPa (250 bar or 3625 psi); Japan 21 MPa (210 bar).

1.10 

HIGH-PRESSURE HOSE

Attention, danger of injury by injection! Wear 

and tear and kinks as well as usage that is not 

appropriate to the purpose of the device can 

cause leakages to form in the high-pressure 

hose. Liquid can be injected into the skin 

through a leakage.

  High-pressure hoses must be checked thoroughly before 

they are used.

  Replace any damaged high-pressure hose immediately.

  Never repair defective high-pressure hoses yourself!

  Avoid sharp bends and folds: the smallest bending radius 

is about 20 cm.

 Do 

not drive over

 the high-pressure hose. Protect against 

sharp objects and edges.

  Never pull on the high-pressure hose to move the device.

  Do not twist the high-pressure hose.

  Do not put the high-pressure hose into solvents. Use only 

a wet cloth to wipe down the outside of the hose.

  Lay the high-pressure hose in such a way as to ensure that 

it cannot be tripped over.

Only use WAGNER original-high-pressure 

hoses in order to ensure functionality, safety 

and durability.

1.11 

ELECTROSTATIC CHARGING (FORMATION OF 

SPARKS OR FLAMES) 

Electrostatic charging of the unit may occur 

during spraying due to the flow speed of 

the coating material. These can cause sparks 

and flames upon discharge. The unit must 

therefore always be earthed via the electrical 

system. The unit must be connected to an 

appropriately-grounded safety outlet.

An electrostatic charging of spray guns and the high-pressure 

hose is discharged through the high-pressure hose. For this 

reason the electric resistance between the connections of the 

high-pressure hose must be equal to or lower than 1 MΩ.

1.12 

USE OF UNITS ON BUILDING SITES AND 

WORKSHOPS

The unit may only be connected to the mains network via a 

special feeding point with a residual-current device with INF 

≤ 30 mA.

1.13 

VENTILATION WHEN SPRAYING IN ROOMS

Adequate ventilation to ensure removal of the solvent vapors 

has to be ensured.

1.14 

SUCTION INSTALLATIONS

The are to be provided by the unit user in accordance with the 

corresponding local regulations.

1.15 

EARTHING OF THE OBJECT

The object to be coated must be earthed.

(Building walls are usually earthed naturally)

1.16 

CLEANING THE UNIT WITH SOLVENTS

When cleaning the unit with solvents, the 

solvent should never be sprayed or pumped 

back into a container with a small opening 

(bunghole). An explosive gas/air mixture can 

arise. The container must be earthed.

1.17 

CLEANING THE UNIT

Danger of short-circuits caused by water in-

gression!

Never spray down the unit with high-pres-

sure or high-pressure steam cleaners.

1.18 

WORK OR REPAIRS AT THE ELECTRICAL 

EQUIPMENT

These may only be carried out by a skilled electrician. No liabil-

ity is assumed for incorrect installation.

1.19 

WORK AT ELECTRICAL COMPONENTS

Unplug the power plug from the outlet before carrying out 

any repair work.

SAFETY REGULATIONS

Содержание HERO 23

Страница 1: ...Service manual with electrical repair instructions for electrically instructed persons of the J Wagner GmbH 2393847 F 02 2019 HERO 23D HERO 23 SF 23 PRO...

Страница 2: ...y start up 1 Faulty units may not be used 2 Secure a Wagner spray gun with the securing lever at the trigger guard 3 Ensure earthing 4 Check the permissible operating pressure of the high pressure hos...

Страница 3: ...4 2 Spare parts list high pressure filter accessory _____ 18 4 3 Spare parts list hopper________________________ 18 4 4 Spare parts list trolley_________________________ 19 4 5 Spare parts list sucti...

Страница 4: ...njection Never point the spray gun at yourself other persons or animals Never use the spray gun without spray jet safety guard The spray jet must not come into contact with any part of the body In wor...

Страница 5: ...n cause sparks and flames upon discharge The unit must therefore always be earthed via the electrical system The unit must be connected to an appropriately grounded safety outlet An electrostatic char...

Страница 6: ...C Max viscosity 20 000 mPas Empty weight 27 kg Hydraulic oil filling quantity Hydraulics housing Gears grease 1 3 liter 45 g Max vibration at the spraygun lower than 2 5 m s Max sound pressure level 7...

Страница 7: ...asurement 1 m distance from unit and 1 60 m abovefloor 12MPa 120bar operatingpressure reverberant floor Taiwan Voltage 110 V AC 60 Hz Fuses 16 A time lag Unit connecting line 6 m long 3 x 2 mm Max cur...

Страница 8: ...nlet valve carefully 6 Clean the valve seat 4 with a cleaning agent and brush ensure that no brush hairs are left behind 7 Clean the seals 5 6 and check for damage Replace if necessary 8 Check all the...

Страница 9: ...smantled the outlet valve regardless of which component you want to replace Note The seal 6 is located inside the paint sec tion 3 The groove in the seal 6 points outwards when replaced 1 7 2 3 4 5 6...

Страница 10: ...g the power plug from the outlet 1 Remove the cover 1 by loosening the screws 2 Loosen the cable threaded joint 2 3 Loosen the wires 3 4 Replace the unit connecting line only an approved power cable w...

Страница 11: ...fan cover Unit can t be ven tilated Ventilation possible in vertical position Not enough oil Check correct oil level Find reason for oil loss Maybe there is oil in the gear box Unit does not suck in M...

Страница 12: ...cking screw 13 2393102 Outlet valve housing assy 14 2393105 O ring and sealing ring 15 2393106 Outlet valve assy incl pos 14 16 9900217 Hexagon head screw 17 9920134 Washer 18 2369435 Paint head 19 23...

Страница 13: ...13 HERO 23D Hero 23 SF 23 Pro Spare parts diagram HERO 23D 1 2 4 5 5 3 6 8 7 9 10 11 12 13 14 15 16 17 18 22 20 21 23 24 25 27 28 29 30 26 31 SPARE PARTS GB...

Страница 14: ...242 2401124 Electric motor 230V China CE AUS incl pos 15 16 Electric motor 100V Japan incl pos 15 16 Electric motor 110V Taiwan incl pos 15 16 15 2393105 Fan assy 16 2393109 Fan cover assy 17 2390886...

Страница 15: ...15 HERO 23D Hero 23 SF 23 Pro SPARE PARTS Spare parts diagram HERO 23D 6 2391115 Rundschnur 1 2 3 4 5 6 8 9 11 13 18 19 20 7 12 15 17 10 16 14 21 22 GB...

Страница 16: ...130 Stop bushing assy 10 2393131 Pressure control knob assy 11 2393132 Sealing screw and seal 12 2391115 O ring 13 2393133 Socket head screw 4 Stk 14 9998144 Retaining ring 15 9960113 Deep groove ball...

Страница 17: ...17 HERO 23D Hero 23 SF 23 Pro 1 2 3 4 14 15 16 17 18 19 20 22 21 23 24 25 11 12 13 10 8 9 5 6 7 SPARE PARTS Spare parts diagram HERO 23D GB...

Страница 18: ...48 0508 450 0508 449 Filter insert 60 meshes Optional Filter insert 100 meshes Filter insert 30 meshes 12 9994 245 Pressure spring 4 2 SPARE PARTS LIST HIGH PRESSURE FILTER Spare parts diagram high pr...

Страница 19: ...7 9 11 9900118 Hexagon screw 12 2369545 Plate damping 13 9920102 Washer 14 9910208 Hexagon nut 15 2393119 Plate damping assy pos 11 14 16 2369556 Wheel 17 9994950 Wheel cap 18 2393121 Wheel assy pos...

Страница 20: ...800 1 12 2240022 Hose clamp 20 2 3 2230342 Filter assy 1 13 2240071 Hose 12 800 1 4 34602 Suction hose fitting 1 14 2240349 Return hose 1 5 2240009 Hexagon nut 1 15 2240345 Filter cover 1 6 2240083 Ho...

Страница 21: ...hazards and special features The work instructions must include safe and correct replace ment of a connecting cable for example 1 2 SKILLED ELECTRICIAN FOR DEFINED TASKS In order to autonomously carr...

Страница 22: ...les must be disconnected at all poles at the place of work before starting work This can be done by means of main switches expert removal of fuses disconnection of plug connectors etc Protecting again...

Страница 23: ...ock in addition to the basic insulation Connection to the protective conductor system is not possible Appliances with this protection class are not permitted in Germany and Austria This protection cla...

Страница 24: ...lanation L1 External conductor L2 External conductor L3 External conductor N Neutral conductor PE Protective conductor 3 Threephase AC voltage 1 8 EXPLANATION OF ELECTRICAL TERMS Rated current The rat...

Страница 25: ...or is an earthed conductor which performs the function of protective conductor and neutral conductor simulta neously Active part of an electrical system An active part is a live part of an electrical...

Страница 26: ...e is defective 7 The defective component must be made inoperative in order to prevent further use 2 2 FUNCTIONAL TEST OF THE CAPACITOR 1 Ensure safe isolation from the supply before commencing work 2...

Страница 27: ...ed to check the electrical functionality If a multimeter is used it should be set to V or VAC 5 Now check the voltage present between L1 and N If this is 230 V AC then the voltage between L1 and PE mu...

Страница 28: ...of all Note down the connection plan 4 Measure all cables to the housing if a continuity is found then the motor has an earth fault and is defective 5 Measurement of the individual windings is not po...

Страница 29: ...ce with BGV A3 must be carried out in order to ensure electrical safety and functionality See chapter 1 4 3 3 REPLACING THE CAPACITOR 1 Ensure safe isolation from the supply before commencing work 2 R...

Страница 30: ...ns from the motor protecting switch 4 The motor protecting switch can now be removed 5 Now install the new motor protecting switch and restore the electrical connection 6 After completing the repair a...

Страница 31: ...in assignment 3 Now replace the motor 4 Observe the pin assignment noted in point 2 when connecting the individual wires Also ensure secure contact when con necting the wires 5 After completing the re...

Страница 32: ...ight blue brown MOTOR WITH TEMPERATURE SWITCH M 1 Z2 U2 OPERATION CAPACITOR C 25 F 400V black 155 C N L Z1 red green yellow blue black N MOTOR SWITCH 8A b U P1 P2 6 3 light blue blue black 340380 2545...

Страница 33: ...33 HERO 23D Hero 23 SF 23 Pro GB 4 2 CONNECTION DIAGRAM HERO 23 JAPAN 100V 50 60Hz M 1 Z2 U2 C 100 F 400V 155 C N L Z1 N 8A b U P1 P2 6 3 340380 254518 254519 b...

Страница 34: ...N POWER CABLE 110V 60Hz TERMINAL STRIP green yellow blue light blue brown MOTOR WITH TEMPERATURE SWITCH M 1 Z2 U2 OPERATION CAPACITOR C 80 F 250V black 155 C N L Z1 red green yellow blue black N MOTOR...

Отзывы: