26
GA 2800EA, GA 2805EA
"?
"?
OPERATING MANUAL
EDITION 12/2008
PART NO. DOC350731
5.3.2
PREPARATION
➞
Earthing the spraying system and make sure that all other conductive parts within the
work area are earthed.
➞
Secure the spray gun to the lifting unit with the suspension bracket or suspension bolt
(accessories)
➞
Connect material hose to pump.
➞
Connect the air hose ø 10 mm; ø 0.39 inches (marked blue) to oil-free, dry air supply
(approx 0.25 MPa; 2.5 bar; 36.3 psi with regulator.
➞
Connect the air hose ø 8 mm; ø 0.31 inches (marked red) for the control air to the
control unit EPG 3000.
➞
When using fl at jet nozzles: Connect the air hose ø 8 mm; ø 0.31 inches (marked green)
for the fan air to the control unit EPG 3000.
➞
Connect electrical cable to the control unit.
➞
Visually check the permissible pressures for all the system components.
➞
Set material pressure and use a suitable medium (solvent or water) to check that
connections do not leak.
➞
Relieve system pressure and spray gun.
7!2.).'
3PARKSFORMWHENTHEPLUGISREMOVED
%XPLOSIONHAZARD
7HENUSINGTHESPRAYGUNINEXPLOSIONHAZARDAREAS
3ECURE THE CABLE CONNECTION WITH THE SUPPLIED LOCKING CLAMP
3)()??'"
Old equipment
New equipment
Содержание GA 2800EA
Страница 2: ......
Страница 13: ...13 GA 2800EA GA 2805EA OPERATING MANUAL EDITION 12 2008 PART NO DOC350731 3 5 PTB CONFORMITY CERTIFICATION...
Страница 50: ......
Страница 51: ......