30
VERSION 01/2018
ORDER NUMBER DOC 2340851
Cobra 40-10 / 40-25
7
OPERATION
7.1
TRAINING THE OPERATING STAFF
The operating staff must be qualified to operate the entire system.
The operating staff must be familiar with the potential risks associated with
improper behavior as well as the necessary protective devices and measures.
Before work commences, the operating staff must receive appropriate system
training.
7.2
EMERGENCY STOP
In the case of unforeseen occurrences:
– Set ball valve (1) to vent.
– Open relief valve (2).
1
2
B_04099
Vent (1)
Switch position Circulation (2)
B_04302
B_04303
Open
Содержание Cobra 40-10
Страница 1: ...B_04233 B_04234 Cobra 40 10 Cobra 40 25 High pressure Double Diaphragm Pumps Version 01 2018...
Страница 2: ......
Страница 49: ......
Страница 69: ......
Страница 83: ......