4 Commissioning [specialist]
18
EN-XXX_CIRCOtransfer-30E-50E_TI-MA-BA-150401-3PAW0501 - 99609x7WAG0x-mub-en - V06
2015/03
17.
Remove the hoses of the flush and fill station and
screw the sealing caps onto the fill and drain
valves. The sealing caps only serve to protect the
valves against dirt. They are not designed to take
up high system pressures. The ball valves must
be closed.
18.
Mount the insulating front shell.
19.
Set to automatic mode on the controller
(see controller instructions).
The commissioning of the solar installation is now
completed.
Please fill in completely the commissioning report on
page 31.