14
Wagner & Guder Medical GmbH
issue May 2021
Direction for use, cubeLITE
Commissioning
Connect power cord to refraction place
Connect the power cord to a properly installed power outlet.
Putt the operating button „I“ green lighting
The unit is ready for operation when the green switch is shining.
This also applies to already installed equipment or analysis of additional components.
Control panel
Figure: 7: control panel
1
operating button
2
reading lamp ON/ OFF
3
patient chair UP/ DOWN
4
window control UP/ DOWN
5
roomlight connection BRIGHT/ DARK
1
2
3
5
4